Facility-level telemetry including power capacity, hardware deployments, supplier relationships, and downstream dependencies. Linked to with cross-referenced BIS Entity List matches.
Detailed intelligence on Hudson Valley Data Center. Tracks operational capacity, ownership structure, and the facility's strategic position within the global AI supply chain, including relevant export control restrictions.
As of 2026-04-27
Description
Grid queue discovery: NYISO queue #1714. Applicant: WITHHELD (NYISO). Classification: genuine_dc. Interconnection: Line 60 138kV - Ramp to Tallman (O&R)
Timeline
Announced
Jul 2, 2024
Notes
Project name explicitly states 'Data Center.' 50 MW is the lower bound of what is included in this filtered dataset and is consistent with a smaller commercial DC. Rockland County is in the New York Metro area (Lower Hudson Valley), a market with documented high demand for DC capacity. A companion entry (queue 1682, same project name, same county, same substation) was withdrawn in July 2024 — this active entry (1714) appears to be the re-filed or corrected version. No Epoch match. No public anno | NEW DISCOVERY. The withdrawal and re-filing pattern (1682 withdrawn, 1714 active) suggests a legitimate developer iterating on their interconnection request. 50 MW is at the small end of this dataset but qualifies as genuine_dc given the name and location context.
1500 Champa
Denver, CO, United States