Scrutica
Power
Supply Chain
Not yet available
Facility-level telemetry including power capacity, hardware deployments, supplier relationships, and downstream dependencies. Linked to with cross-referenced BIS Entity List matches.
Detailed intelligence on Lake Mariner Data II. Tracks operational capacity, ownership structure, and the facility's strategic position within the global AI supply chain, including relevant export control restrictions.
As of 2026-04-27
Description
Grid queue discovery: NYISO queue #1670. Applicant: TeraWulf / WULF Compute (operator). Classification: genuine_dc. Interconnection: Kintigh 345kV Substation (NYSEG)
Timeline
Announced
Jan 23, 2024
Notes
The Lake Mariner campus in Barker, Niagara County is operated by TeraWulf (ticker: WULF) and is TRACKED by Epoch AI as 'Fluidstack Lake Mariner' — the AI/HPC buildings (Buildings 1-5, up to ~459 MW) are leased to Fluidstack for Google TPU deployment serving Anthropic. Queue ID 1670 represents expansion capacity beyond what Epoch currently tracks. TeraWulf's $3.2B financing (October 2025) and Buildings 1-5 timeline confirms the site is actively scaling. This queue entry is the 'Data II' expansion | Matched Epoch facility: Fluidstack Lake Mariner (Epoch ID: data_centers.csv row ~80) | MATCHED to known Epoch facility. Counts in matched_to_known, not as a new discovery. However, the specific 250 MW expansion tranche is beyond Epoch's current tracking scope — relevant as a leading indicator of capacity growth at a known site.
1500 Champa
Denver, CO, United States