Scrutica
Power
Supply Chain
Not yet available
Facility-level telemetry including power capacity, hardware deployments, supplier relationships, and downstream dependencies. Linked to with cross-referenced BIS Entity List matches.
Detailed intelligence on St Lawrence Data and Agricultural Center. Tracks operational capacity, ownership structure, and the facility's strategic position within the global AI supply chain, including relevant export control restrictions.
As of 2026-04-27
Description
Grid queue discovery: NYISO queue #1213. Applicant: PetaWatt Holdings, Inc.. Classification: possible_dc. Interconnection: Dennison 115kV substation (NM-NG)
Timeline
Announced
Jun 28, 2021
Notes
Applicant is PetaWatt Holdings, Inc., confirmed by the raw NYISO CSV (the companion entry 1201, filed 2021-06-10 by the same entity, was withdrawn 2021-08-31). PetaWatt Holdings is documented in Massena, NY as operating a crypto currency mining operation with containers on a County Route 42 property, and has been developing a substation there as of late 2025. The 'Data and Agricultural Center' name is unusual — 'agricultural' usage may be a cover for industrial power use or a legitimate co-locat | PetaWatt Holdings appears to be a legitimate New York-based operator but is primarily associated with crypto mining, not AI HPC. The 200 MW request is probably aspirational given the company's documented small-scale current operations. Classification as possible_dc rather than genuine_dc reflects th
1500 Champa
Denver, CO, United States