Facility-level telemetry including power capacity, hardware deployments, supplier relationships, and downstream dependencies. Linked to with cross-referenced BIS Entity List matches.
Detailed intelligence on North Country Data Center. Tracks operational capacity, ownership structure, and the facility's strategic position within the global AI supply chain, including relevant export control restrictions.
As of 2026-04-27
Description
Grid queue discovery: NYISO queue #0979. Applicant: WITHHELD (NYISO). Classification: possible_dc. Interconnection: Reynolds 115kV (NYPA)
Timeline
Announced
Jan 22, 2020
Notes
Project name explicitly references 'Data Center.' 176 MW is consistent with a mid-scale DC campus. Queue date of January 2020 indicates a long-standing project — 6+ years in the NYISO queue without withdrawal suggests either a slow-moving legitimate project or repeated study cycle delays. NYPA interconnect at Reynolds 115kV in St. Lawrence County. The applicant name is withheld by NYISO. Petawatt Holdings filed a withdrawn 100 MW load request (queue 0909) at the nearby Dennison 115kV substation | Long queue tenure (6+ years, still active as of March 2026) without public announcement is unusual. Could be a legitimate project awaiting power allocation or a placeholder reservation. 176 MW scale is in the possible_dc range. Not counted as a confirmed new discovery.