<!--
Source: https://scrutica.com/facilities/gridstatus-nyiso-1726
Format: native markdown twin rendered from the same data modules as the page (not an HTML conversion).
Machine access: https://scrutica.com/api/mcp (MCP) · https://scrutica.com/agents (all surfaces)
-->

# Data & Technology Campus

Facility record `gridstatus-nyiso-1726` — data source: gridstatus (https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx); authority tier 2

| Field | Value |
| --- | --- |
| Type | hyperscale dc |
| Status | announced |
| Location | NY, US |
| Power capacity | 300 MW |
| IT load | not published |
| GPU count | not published |
| Peak PFLOPS (FP16) | not published |
| Owner | not published |
| Operator | not published |
| Announced | not published |
| Operational | not published |

Grid queue discovery: NYISO queue #1726. Applicant: WITHHELD (NYISO). Classification: genuine_dc. Interconnection: Huntley - Packard 230kV line 78 (NM-NG)

## Data-quality flags

- nyiso_ercot_grid_queue_id_scheme_merge

## Cite

> Scrutica, "Data & Technology Campus" (facility record), https://scrutica.com/facilities/gridstatus-nyiso-1726; data source: gridstatus; accessed 2026-07-27.

Full interactive record: https://scrutica.com/facilities/gridstatus-nyiso-1726 · Methodology for derived values: https://scrutica.com/methodology#flop-estimation · All programmatic surfaces: https://scrutica.com/agents
