# North Country Data Center

Facility record `gridstatus-nyiso-0979` — data source: gridstatus (https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx); authority tier 2

| Field | Value |
| --- | --- |
| Type | hyperscale dc |
| Status | announced |
| Location | NY, US |
| Power capacity | 176 MW |
| IT load | not published |
| GPU count | not published |
| Peak PFLOPS (FP16) | not published |
| Owner | not published |
| Operator | not published |
| Announced | not published |
| Operational | not published |

Grid queue discovery: NYISO queue #0979. Applicant: WITHHELD (NYISO). Classification: possible_dc. Interconnection: Reynolds 115kV (NYPA)

## Data-quality flags

- nyiso_ercot_grid_queue_id_scheme_merge

## Cite

> Scrutica, "North Country Data Center" (facility record), https://scrutica.com/facilities/gridstatus-nyiso-0979; data source: gridstatus; accessed 2026-07-28.

Full interactive record: https://scrutica.com/facilities/gridstatus-nyiso-0979 · Methodology for derived values: https://scrutica.com/methodology#flop-estimation · All programmatic surfaces: https://scrutica.com/agents