<!--
Source: https://scrutica.com/facilities/gridstatus-ercot-25INR0688
Format: native markdown twin rendered from the same data modules as the page (not an HTML conversion).
Machine access: https://scrutica.com/api/mcp (MCP) · https://scrutica.com/agents (all surfaces)
-->

# Giga Texas Data Center

Facility record `gridstatus-ercot-25INR0688` — data source: gridstatus (https://www.ercot.com/misdownload/servlets/mirDownload?doclookupId=1200125027); authority tier 2

| Field | Value |
| --- | --- |
| Type | hyperscale dc |
| Status | announced |
| Location | TX, US |
| Power capacity | 133 MW |
| IT load | not published |
| GPU count | not published |
| Peak PFLOPS (FP16) | not published |
| Owner | not published |
| Operator | not published |
| Announced | not published |
| Operational | not published |

Grid queue discovery: ERCOT queue #25INR0688. Applicant: Giga Texas Energy, LLC (Tesla subsidiary). Classification: genuine_dc. Interconnection: HORNSBY Substation, 345kV (behind-meter at 24.9kV)

## Data-quality flags

- nyiso_ercot_grid_queue_id_scheme_merge

## Cite

> Scrutica, "Giga Texas Data Center" (facility record), https://scrutica.com/facilities/gridstatus-ercot-25INR0688; data source: gridstatus; accessed 2026-07-27.

Full interactive record: https://scrutica.com/facilities/gridstatus-ercot-25INR0688 · Methodology for derived values: https://scrutica.com/methodology#flop-estimation · All programmatic surfaces: https://scrutica.com/agents
