# TSMC Arizona Fab 21 (Phase 2)

Facility record `fac-tsmc-arizona-fab21-p2` — data source: company-press-release (https://www.tsmc.com/static/abouttsmcaz/index.htm); authority tier 2

| Field | Value |
| --- | --- |
| Type | logic fab |
| Status | under_construction |
| Location | Phoenix, Arizona, US (33.7778581, -112.1621572) |
| Power capacity | not published MW |
| IT load | not published |
| GPU count | not published |
| Peak PFLOPS (FP16) | not published |
| Owner | TSMC |
| Operator | TSMC |
| Announced | 2022-12-06 |
| Operational | not published |

Grid context: balancing authority Arizona Public Service Company; grid carbon intensity 319 gCO2/kWh.

TSMC Arizona Phase 2: N3E (3nm). Equipment installation began ahead of schedule. Volume production targeted H2 2027 (accelerated from original 2028 timeline).