# Abernathy HPC Campus

Facility record `fac-terawulf-abernathy` — data source: SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1083301/000110465925124839/tm2534384d1_8k.htm); authority tier 1

| Field | Value |
| --- | --- |
| Type | AI Training |
| Status | Under construction |
| Location | Abernathy, Texas, US (33.8323812, -101.8430151) |
| Facility power | 240 MW |
| Power is operating capacity | no (under construction) |
| IT load | 168 MW |
| GPU count | not published |
| H100-equivalents | not published |
| Peak PFLOPS (FP16) | not published |
| Site owner | The site owner is unrecorded. |
| Site operator | No organisation is recorded as operating this site. |
| AI hardware owner | No AI-hardware owner is recorded for this site. |
| Announced | not published |
| Operational | not published |

A liquid-cooled AI data centre at Abernathy, Texas, designed for up to 240 MW of gross power and 168 MW of critical IT load, leased to Fluidstack under a 25-year lease with Google backing. A joint venture of TeraWulf and Fluidstack was building it in May 2026 for delivery in the fourth quarter of 2026, and in July 2026 TeraWulf agreed to sell its 50.1% stake to an investor group led by Fluidstack.

Source: [SEC EDGAR](<https://www.sec.gov/Archives/edgar/data/1083301/000110465925124839/tm2534384d1_8k.htm>)

## Cite

> Scrutica, "Abernathy HPC Campus" (facility record), https://scrutica.com/facilities/fac-terawulf-abernathy; data source: SEC EDGAR; accessed 2026-11-03.

Full interactive record: https://scrutica.com/facilities/fac-terawulf-abernathy · Methodology for derived values: https://scrutica.com/methodology#flop-estimation · All programmatic surfaces: https://scrutica.com/agents