<!--
Source: https://scrutica.com/facilities/fac-stargate-abilene
Format: native markdown twin rendered from the same data modules as the page (not an HTML conversion).
Machine access: https://scrutica.com/api/mcp (MCP) · https://scrutica.com/agents (all surfaces)
-->

# Stargate Abilene (OpenAI/Oracle/SoftBank)

Facility record `fac-stargate-abilene` — data source: company-press-release (https://openai.com/index/announcing-the-stargate-project/); authority tier 2; contains estimated values (is_estimated: true)

| Field | Value |
| --- | --- |
| Type | ai training |
| Status | operational |
| Location | Abilene, Texas, US (32.4487, -99.7331) |
| Power capacity | 1,200 MW |
| IT load | not published |
| GPU count | not published |
| Peak PFLOPS (FP16) | not published |
| Owner | Oracle Corporation |
| Operator | Oracle Corporation |
| Announced | 2025-01-21 |
| Operational | 2025-09-23 |

Grid context: balancing authority Electric Reliability Council of Texas, Inc.; grid carbon intensity 333 gCO2/kWh.

Flagship Stargate campus at 5502 Spinks Rd, Abilene, TX. Part of the $500B Stargate joint venture (OpenAI, SoftBank, Oracle, MGX). 1,100-acre campus running on Oracle Cloud Infrastructure with NVIDIA GPUs. First 200 MW operational Sep 2025; 10 buildings under construction for ~1.2 GW total. Oracle deploying 450,000+ GB200 GPUs under 15-year lease. Crusoe Energy co-developing adjacent AI factory buildings. OpenAI dropped further expansion plans in Mar 2026; Microsoft acquired the additional capacity.

## Cite

> Scrutica, "Stargate Abilene (OpenAI/Oracle/SoftBank)" (facility record), https://scrutica.com/facilities/fac-stargate-abilene; data source: company-press-release; accessed 2026-07-27.

Full interactive record: https://scrutica.com/facilities/fac-stargate-abilene · Methodology for derived values: https://scrutica.com/methodology#flop-estimation · All programmatic surfaces: https://scrutica.com/agents
