<!--
Source: https://scrutica.com/facilities/fac-sigma2-olivia-lefdal
Format: native markdown twin rendered from the same data modules as the page (not an HTML conversion).
Machine access: https://scrutica.com/api/mcp (MCP) · https://scrutica.com/agents (all surfaces)
-->

# Olivia (Sigma2)

Facility record `fac-sigma2-olivia-lefdal` — data source: sigma2-2026-09-11 (https://www.sigma2.no/news/2026/olivia-expands-massive-gpu-capacity-upgrade); authority tier 1

| Field | Value |
| --- | --- |
| Type | HPC Center |
| Status | Operational |
| Location | Nordfjordeid, Vestland, NO (61.907681, 5.9891381) |
| Power capacity | not published MW |
| IT load | not published |
| GPU count | 448 |
| Peak PFLOPS (FP16) | not published |
| Owner | not published |
| Operator | Sigma2 AS |
| Announced | not published |
| Operational | not published |

Olivia is Norway's national supercomputer, operated by Sigma2 and installed at Lefdal Mine Data Centers in Nordfjordeid. Delivered by HPE, it launched in 2025 with 64,512 AMD CPU cores and 304 NVIDIA GH200 superchips; on 27 February 2026 the operator reported that 144 GH200 had been added, for 448 in total. The expansion's commissioning day and the GH200 variant are not stated.

## Cite

> Scrutica, "Olivia (Sigma2)" (facility record), https://scrutica.com/facilities/fac-sigma2-olivia-lefdal; data source: sigma2-2026-09-11; accessed 2026-09-11.

Full interactive record: https://scrutica.com/facilities/fac-sigma2-olivia-lefdal · Methodology for derived values: https://scrutica.com/methodology#flop-estimation · All programmatic surfaces: https://scrutica.com/agents
