# Polar HER01

Facility record `fac-polar-her01` — data source: Company disclosure (press / IR) (https://www.polardc.com/post/polar-announces-new-ai-ready-data-center-development-in-her%C3%B8ya-norway); authority tier 2

| Field | Value |
| --- | --- |
| Type | AI Training |
| Status | Announced |
| Location | Porsgrunn, Telemark, NO (59.1135597, 9.6363483) |
| Facility power | not published |
| IT load | 41 MW |
| GPU count | not published |
| H100-equivalents | not published |
| Peak PFLOPS (FP16) | not published |
| Site owner | The site owner is unrecorded. |
| Site operator | No organisation is recorded as operating this site. |
| AI hardware owner | No AI-hardware owner is recorded for this site. |
| Announced | not published |
| Operational | not published |

Polar Data Centers' fit-out of an existing building in Herøya Industrial Park, Porsgrunn, as a data centre of 41 MW IT load, on land leased from Siva Herøya; Polar described the site as ready for construction in May 2026, and in October 2026 it was still reported as a planned development. Polar signed a capacity agreement for the site with CoreWeave Norway AS in November 2025.

Source: [Company disclosure \(press / IR\)](<https://www.polardc.com/post/polar-announces-new-ai-ready-data-center-development-in-her%C3%B8ya-norway>)