# Beacon Point Data Center

Facility record `fac-hut8-beacon-point` — data source: SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1964789/000110465926071952/tm2617190d1_8k.htm); authority tier 1

| Field | Value |
| --- | --- |
| Type | AI Training |
| Status | Under construction |
| Location | Robstown, Texas, US (27.834525, -97.614758) |
| Facility power | 1,000 MW |
| Power is operating capacity | no (under construction) |
| IT load | 704 MW |
| GPU count | not published |
| H100-equivalents | not published |
| Peak PFLOPS (FP16) | not published |
| Site owner | The site owner is unrecorded. |
| Site operator | No organisation is recorded as operating this site. |
| AI hardware owner | No AI-hardware owner is recorded for this site. |
| Announced | not published |
| Operational | not published |

Hut 8's AI data centre campus on about 521 acres along FM 1694 outside Robstown in Nueces County, Texas, with 1,000 MW of utility capacity and 704 MW of IT capacity leased in two 352 MW leases to one unnamed tenant rated AA- or higher. Construction of Phase 1 and the campus substation was under way by August 2026, with the first data hall targeted for the third quarter of 2027 and site preparation started for Phase 2.

Source: [SEC EDGAR](<https://www.sec.gov/Archives/edgar/data/1964789/000110465926071952/tm2617190d1_8k.htm>)

## Cite

> Scrutica, "Beacon Point Data Center" (facility record), https://scrutica.com/facilities/fac-hut8-beacon-point; data source: SEC EDGAR; accessed 2026-11-03.

Full interactive record: https://scrutica.com/facilities/fac-hut8-beacon-point · Methodology for derived values: https://scrutica.com/methodology#flop-estimation · All programmatic surfaces: https://scrutica.com/agents