<!--
Source: https://scrutica.com/facilities/fac-esmc-dresden
Format: native markdown twin rendered from the same data modules as the page (not an HTML conversion).
Machine access: https://scrutica.com/api/mcp (MCP) · https://scrutica.com/agents (all surfaces)
-->

# ESMC Dresden Fab

Facility record `fac-esmc-dresden` — data source: eu-commission-decision (https://digital-strategy.ec.europa.eu/en/news/commission-approves-eu5-billion-german-state-aid-measure-support-esmc-setting-new-semiconductor); authority tier 1

| Field | Value |
| --- | --- |
| Type | logic fab |
| Status | under_construction |
| Location | Dresden, DE (51.0504, 13.7373) |
| Power capacity | not published MW |
| IT load | not published |
| GPU count | not published |
| Peak PFLOPS (FP16) | not published |
| Owner | European Semiconductor Manufacturing Company (ESMC) |
| Operator | European Semiconductor Manufacturing Company (ESMC) |
| Announced | not published |
| Operational | not published |

TSMC/Bosch/Infineon/NXP joint-venture fab. 28/22nm planar and 16/12nm FinFET; 40,000 300mm wafers/month (480,000/yr) at full capacity, planned by 2029 (EC decision 2024-08-20; TSMC groundbreaking release pr.tsmc.com/english/news/3169). Total investment expected to exceed €10B incl. €5B approved German state aid. Production start date not stated by either source. Coordinates are city-level.

## Cite

> Scrutica, "ESMC Dresden Fab" (facility record), https://scrutica.com/facilities/fac-esmc-dresden; data source: eu-commission-decision; accessed 2026-07-27.

Full interactive record: https://scrutica.com/facilities/fac-esmc-dresden · Methodology for derived values: https://scrutica.com/methodology#flop-estimation · All programmatic surfaces: https://scrutica.com/agents
