# Equinix DC2 (Ashburn redevelopment)

Facility record `fac-equinix-dc2` — data source: equinix-10k-2024 (https://www.sec.gov/Archives/edgar/data/1101239/000162828025005126/eqix-20241231.htm); authority tier 1

| Field | Value |
| --- | --- |
| Type | colocation |
| Status | under_construction |
| Location | Ashburn, VA, US (39.014365, -77.457841) |
| Power capacity | not published MW |
| IT load | not published |
| GPU count | not published |
| Peak PFLOPS (FP16) | not published |
| Owner | Equinix, Inc. |
| Operator | Equinix, Inc. |
| Announced | not published |
| Operational | not published |

DC2 Redevelopment, target open Q4 2025 per Equinix FY2024 10-K Item 2 construction-projects table. Sellable cabinet capacity: 425. Total capex: $56M. Part of the Washington, D.C./Ashburn metro cluster (DC1-DC15 + DC21-DC22 disclosed at metro level in the 10-K Item 2 Properties table; Ashburn is one of Equinix's two largest US Americas metros by cabinet count alongside Silicon Valley).