# STACK Infrastructure NVA02

Facility record `fac-epoch-stack-infrastructure-nva02` — data source: epoch-ai (https://epoch.ai/data/data-centers); authority tier 2; contains estimated values (is_estimated: true)

| Field | Value |
| --- | --- |
| Type | ai training |
| Status | operational |
| Location | Manassas, Virginia, US (38.746272, -77.537594) |
| Power capacity | 85 MW |
| IT load | not published |
| GPU count | not published |
| Peak PFLOPS (FP16) | not published |
| Owner | not published |
| Operator | not published |
| Announced | not published |
| Operational | not published |

Stack Infrastructure NVA02 is a 10-building (6 for AI) data center campus, with a future IT power capacity of 350 MW for AI.
Construction began Q4 2019, with their non-AI buildings finishing by Q4 2022.
Construction ramped up in 2023, with the first high-density AI data center (containing two independent halls) becoming operational Q4 2024.
Their progress indicates a 2028 finish date for the six total AI data centers.

## Data-quality flags

- source_url_contains_claim_verified

## Cite

> Scrutica, "STACK Infrastructure NVA02" (facility record), https://scrutica.com/facilities/fac-epoch-stack-infrastructure-nva02; data source: epoch-ai; accessed 2026-07-27.

Full interactive record: https://scrutica.com/facilities/fac-epoch-stack-infrastructure-nva02 · Methodology for derived values: https://scrutica.com/methodology#flop-estimation · All programmatic surfaces: https://scrutica.com/agents