# Southgate Melbourne

Facility record `fac-epoch-southgate-melbourne` — data source: Epoch AI — frontier data centres (https://epoch.ai/data/data-centers); authority tier 2

| Field | Value |
| --- | --- |
| Type | AI Training |
| Status | Operational |
| Location | Victoria, AU (-37.8174, 144.8441) |
| Location in the source's words | Epoch AI Frontier Data Centers gives the city as “Melbourne” and the state as “Victoria” \(download of 30 October 2026\). |
| Facility power | 57 MW |
| Power is operating capacity | yes |
| IT load | 41 MW |
| GPU count | not published |
| H100-equivalents | 46,488 |
| Peak PFLOPS (FP16) | not published |
| Site owner | The site owner is unrecorded. |
| Site operator | No organisation is recorded as operating this site. |
| AI hardware owner | Firmus |
| Announced | not published |
| Operational | not published |

## Role evidence

Each role is stated only as the relationship its own source establishes.

- **AI hardware owner: Firmus.** Epoch AI's field for who owns the AI hardware, which it defines as not necessarily the owner or operator of the facility. “Owner: Firmus \#confident” [Source](<https://epoch.ai/data/data-centers>)