# QTS Cedar Rapids

Facility record `fac-epoch-qts-cedar-rapids` — data source: epoch-ai (https://epoch.ai/data/data-centers); authority tier 2; contains estimated values (is_estimated: true)

| Field | Value |
| --- | --- |
| Type | ai training |
| Status | under_construction |
| Location | Cedar Rapids, Iowa, US (41.906389, -91.750833) |
| Power capacity | not published MW |
| IT load | not published |
| GPU count | not published |
| Peak PFLOPS (FP16) | not published |
| Owner | not published |
| Operator | not published |
| Announced | not published |
| Operational | not published |

QTS Cedar Rapids sits alongside a Google data center in Big Cedar Industrial Center. It is divided into two phases which are expected to  be completed in late 2026 and late 2027. We estimate its power capacity based on satellite images and 3D renderings of the air-cooled chillers lining each building. The compute capacity is based on this power capacity and the assumption that the best available NVIDIA AI servers will be used for each phase. The estimated power for phase 1 is consistent with a 6

## Data-quality flags

- source_url_contains_claim_verified

## Cite

> Scrutica, "QTS Cedar Rapids" (facility record), https://scrutica.com/facilities/fac-epoch-qts-cedar-rapids; data source: epoch-ai; accessed 2026-07-27.

Full interactive record: https://scrutica.com/facilities/fac-epoch-qts-cedar-rapids · Methodology for derived values: https://scrutica.com/methodology#flop-estimation · All programmatic surfaces: https://scrutica.com/agents