<!--
Source: https://scrutica.com/facilities/fac-epoch-openai-stargate-uae
Format: native markdown twin rendered from the same data modules as the page (not an HTML conversion).
Machine access: https://scrutica.com/api/mcp (MCP) · https://scrutica.com/agents (all surfaces)
-->

# OpenAI Stargate UAE

Facility record `fac-epoch-openai-stargate-uae` — data source: epoch-ai (https://epoch.ai/data/data-centers); authority tier 2; contains estimated values (is_estimated: true)

| Field | Value |
| --- | --- |
| Type | ai training |
| Status | under_construction |
| Location | Abu Dhabi, Abu Dhabi, AE (24.154167, 54.444167) |
| Power capacity | not published MW |
| IT load | not published |
| GPU count | not published |
| Peak PFLOPS (FP16) | not published |
| Owner | G42 |
| Operator | G42 |
| Announced | not published |
| Operational | not published |

The Stargate data center campus in Abu Dhabi, United Arab Emirates, is the first non-US Stargate cluster announced by OpenAI. We estimate power capacity based on company announcements and the scale of buildings in satellite imagery, and also use that imagery to estimate the construction timeline. Compute capacity is based on reported export agreements with the US, which suggest that G42 and/or Oracle can acquire 100,000 state-of-the-art NVIDIA chips each year.

## Data-quality flags

- source_url_contains_claim_verified

## Cite

> Scrutica, "OpenAI Stargate UAE" (facility record), https://scrutica.com/facilities/fac-epoch-openai-stargate-uae; data source: epoch-ai; accessed 2026-07-27.

Full interactive record: https://scrutica.com/facilities/fac-epoch-openai-stargate-uae · Methodology for derived values: https://scrutica.com/methodology#flop-estimation · All programmatic surfaces: https://scrutica.com/agents
