<!--
Source: https://scrutica.com/facilities/fac-epoch-openai-stargate-abilene
Format: native markdown twin rendered from the same data modules as the page (not an HTML conversion).
Machine access: https://scrutica.com/api/mcp (MCP) · https://scrutica.com/agents (all surfaces)
-->

# OpenAI Stargate Abilene

Facility record `fac-epoch-openai-stargate-abilene` — data source: epoch-ai (https://epoch.ai/data/data-centers); authority tier 2; contains estimated values (is_estimated: true)

| Field | Value |
| --- | --- |
| Type | ai training |
| Status | operational |
| Location | Abilene, Texas, US (32.499722, -99.783889) |
| Power capacity | 421 MW |
| IT load | not published |
| GPU count | not published |
| Peak PFLOPS (FP16) | not published |
| Owner | Oracle Corporation |
| Operator | Oracle Corporation |
| Announced | not published |
| Operational | not published |

The Stargate data center campus in Abilene Texas is expected to host OpenAI's largest compute cluster from the second half of 2025 through 2026. This is the first of several sites in the Stargate project, spanning the US and the globe. We have a variety of sources to estimate the capacity of this data center, from company announcements, to permit documents, to satellite imagery of air-cooled chillers.

## Data-quality flags

- source_url_contains_claim_verified

## Cite

> Scrutica, "OpenAI Stargate Abilene" (facility record), https://scrutica.com/facilities/fac-epoch-openai-stargate-abilene; data source: epoch-ai; accessed 2026-07-27.

Full interactive record: https://scrutica.com/facilities/fac-epoch-openai-stargate-abilene · Methodology for derived values: https://scrutica.com/methodology#flop-estimation · All programmatic surfaces: https://scrutica.com/agents
