# Microsoft Fairwater Atlanta

Facility record `fac-epoch-microsoft-fairwater-atlanta` — data source: Epoch AI — frontier data centres (https://epoch.ai/data/data-centers); authority tier 2; contains estimated values (is_estimated: true)

| Field | Value |
| --- | --- |
| Type | AI Training |
| Status | Operational |
| Location | Fayetteville, Georgia, US (33.448611, -84.522222) |
| Power capacity | 859 MW |
| Power is operating capacity | yes |
| IT load | 636 MW |
| GPU count | not published |
| Peak PFLOPS (FP16) | not published |
| Site owner | The site owner is unrecorded. |
| Site operator | No organisation is recorded as operating this site. |
| AI hardware owner | Microsoft Corporation |
| Announced | not published |
| Operational | not published |

## Corrections

- [25 September 2026 · Export-control alignment: four SEC filers read as unresolved because of their own subsidiaries](https://scrutica.com/corrections#coordination-gaps-sec-filer-subsidiaries-2026-09-25)

## Role evidence

Each role is stated only as the relationship its own source establishes.

- **AI hardware owner: Microsoft Corporation.** Epoch AI's field for who owns the AI hardware, which it defines as not necessarily the owner or operator of the facility. [Source](<https://epoch.ai/data/data-centers-documentation/records>)

Description quoted from Epoch AI Frontier Data Centers

> Microsoft Fairwater Atlanta is a QTS-built data center with Microsoft as a tenant, possibly for the purpose of providing compute to OpenAI. We estimate compute for it primarily based on satellite and aerial imagery of the chillers.

Source: [Epoch AI Frontier Data Centers](<https://epoch.ai/data/data-centers>), CC BY 4.0

## Organisations recorded at the site

### OpenAI — Uses the compute \(source marks likely\)

Named in Epoch AI's field for labs using the compute; it records use, not a lease.

The relationship is inferred.

Recorded start date: not stated. Recorded end date: not stated.
[Epoch AI Frontier Data Centers](<https://epoch.ai/data/data-centers>)

### Georgia Power — Power provider

Named in Epoch AI's field for companies involved in providing power to the site.

Recorded start date: not stated. Recorded end date: not stated.
[Epoch AI Frontier Data Centers](<https://epoch.ai/data/data-centers>)