<!--
Source: https://scrutica.com/facilities/fac-epoch-meta-prometheus
Format: native markdown twin rendered from the same data modules as the page (not an HTML conversion).
Machine access: https://scrutica.com/api/mcp (MCP) · https://scrutica.com/agents (all surfaces)
-->

# Meta Prometheus

Facility record `fac-epoch-meta-prometheus` — data source: epoch-ai (https://epoch.ai/data/data-centers); authority tier 2; contains estimated values (is_estimated: true)

| Field | Value |
| --- | --- |
| Type | ai training |
| Status | operational |
| Location | New Albany, Ohio, US (40.068056, -82.75) |
| Power capacity | 631 MW |
| IT load | not published |
| GPU count | not published |
| Peak PFLOPS (FP16) | not published |
| Owner | Meta Platforms, Inc. |
| Operator | Meta Platforms, Inc. |
| Announced | not published |
| Operational | not published |

Meta Prometheus is unusual for its ad hoc construction, spanning the full length of New Albany Business Park. A combination of weatherproof tents, colocation facilities and Meta’s traditional data center buildings, this data center shows Meta’s pivot towards AI. Reflecting that patchwork, our analysis uses a combination of land use maps, natural gas turbine permitting, and satellite/aerial imagery of cooling equipment to estimate compute capacity.

## Data-quality flags

- source_url_contains_claim_verified

## Cite

> Scrutica, "Meta Prometheus" (facility record), https://scrutica.com/facilities/fac-epoch-meta-prometheus; data source: epoch-ai; accessed 2026-07-27.

Full interactive record: https://scrutica.com/facilities/fac-epoch-meta-prometheus · Methodology for derived values: https://scrutica.com/methodology#flop-estimation · All programmatic surfaces: https://scrutica.com/agents
