# Meta Eagle Mountain

Facility record `fac-epoch-meta-eagle-mountain` — data source: Epoch AI — frontier data centres (https://epoch.ai/data/data-centers); authority tier 2; contains estimated values (is_estimated: true)

| Field | Value |
| --- | --- |
| Type | AI Training |
| Status | Operational |
| Location | Eagle Mountain, Utah, US (40.269889, -112.019444) |
| Location basis | The record's coordinates fall in Eagle Mountain, Utah County, Utah \(U.S. Census Bureau boundaries as of 1 January 2026, read 30 October 2026\). |
| Location in the source's words | Epoch AI Frontier Data Centers gives the address as “1275 N Community Cir, Eagle Mountain, UT 84005”, the city as “Eagle Mountain” and the state as “Utah” \(download of 30 October 2026\). |
| Facility power | 179 MW |
| Power is operating capacity | yes |
| IT load | 133 MW |
| GPU count | not published |
| H100-equivalents | 151,354 |
| Peak PFLOPS (FP16) | not published |
| Site owner | The site owner is unrecorded. |
| Site operator | No organisation is recorded as operating this site. |
| AI hardware owner | Meta Platforms, Inc. |
| Announced | not published |
| Operational | not published |

## Role evidence

Each role is stated only as the relationship its own source establishes.

- **AI hardware owner: Meta Platforms, Inc.** Epoch AI's field for who owns the AI hardware, which it defines as not necessarily the owner or operator of the facility. “Owner: Meta \#confident” [Source](<https://epoch.ai/data/data-centers>)

## Organisations recorded at the site

### Williams — Power provider

Named in Epoch AI's field for companies involved in providing power to the site.

Recorded start date: not stated. Recorded end date: not stated.
[Epoch AI Frontier Data Centers](<https://epoch.ai/data/data-centers>)

### Mortenson — Construction

Named in Epoch AI's field for companies involved in construction of the site.

Recorded start date: not stated. Recorded end date: not stated.
[Epoch AI Frontier Data Centers](<https://epoch.ai/data/data-centers>)

## Campus: Meta Eagle Mountain, UT

These records describe the same physical site at different scopes, and their power figures are never added together. Across the platform, recorded totals count the canonical member once; operating totals count a member's figure only if it is operating capacity.
Note: Two records describe Meta's Eagle Mountain data center. Totals use Epoch's 179 MW of facility power; the other record carries no figure.

| Member | Status | Scope | Power (MW) | Operating capacity | Canonical for power | Source |
| --- | --- | --- | --- | --- | --- | --- |
| [Meta Eagle Mountain](https://scrutica.com/facilities/fac-epoch-meta-eagle-mountain) | Operational | site total | 179 | yes | yes | Epoch AI Frontier Data Centers |
| [Meta Eagle Mountain Data Center](https://scrutica.com/facilities/fac-im3-meta-eagle-mountain-data-center-ut) | Operational | — | — | — | no | Documented ownership record |

## Cite

> Scrutica, "Meta Eagle Mountain" (facility record), https://scrutica.com/facilities/fac-epoch-meta-eagle-mountain; data source: Epoch AI — frontier data centres; accessed 2026-10-31.

Full interactive record: https://scrutica.com/facilities/fac-epoch-meta-eagle-mountain · Methodology for derived values: https://scrutica.com/methodology#flop-estimation · All programmatic surfaces: https://scrutica.com/agents