<!--
Source: https://scrutica.com/facilities/fac-epoch-google-council-bluffs-east
Format: native markdown twin rendered from the same data modules as the page (not an HTML conversion).
Machine access: https://scrutica.com/api/mcp (MCP) · https://scrutica.com/agents (all surfaces)
-->

# Google Council Bluffs (East)

Facility record `fac-epoch-google-council-bluffs-east` — data source: epoch-ai (https://epoch.ai/data/data-centers); authority tier 2; contains estimated values (is_estimated: true)

| Field | Value |
| --- | --- |
| Type | ai training |
| Status | operational |
| Location | Council Bluffs, Iowa, US (41.173333, -95.790278) |
| Power capacity | 237 MW |
| IT load | not published |
| GPU count | not published |
| Peak PFLOPS (FP16) | not published |
| Owner | Google |
| Operator | Google |
| Announced | not published |
| Operational | not published |

Google Council Bluffs dates back to 2014, but our analysis focuses on the buildings added to the east since 2024, which are likely to have most of the AI compute. These buildings are similar to other Google data centers like New Albany and Omaha. We estimate the power capacity based on our cooling tower model. The compute capacity is based on this power capacity, and the energy efficiency of Google TPU chips that are available when each building becomes operational.

## Data-quality flags

- source_url_contains_claim_verified

## Cite

> Scrutica, "Google Council Bluffs (East)" (facility record), https://scrutica.com/facilities/fac-epoch-google-council-bluffs-east; data source: epoch-ai; accessed 2026-07-27.

Full interactive record: https://scrutica.com/facilities/fac-epoch-google-council-bluffs-east · Methodology for derived values: https://scrutica.com/methodology#flop-estimation · All programmatic surfaces: https://scrutica.com/agents
