<!--
Source: https://scrutica.com/facilities/fac-epoch-crusoe-abilene-expansion
Format: native markdown twin rendered from the same data modules as the page (not an HTML conversion).
Machine access: https://scrutica.com/api/mcp (MCP) · https://scrutica.com/agents (all surfaces)
-->

# Crusoe Abilene Expansion

Facility record `fac-epoch-crusoe-abilene-expansion` — data source: epoch-ai (https://epoch.ai/data/data-centers); authority tier 2; contains estimated values (is_estimated: true)

| Field | Value |
| --- | --- |
| Type | ai training |
| Status | under_construction |
| Location | Abilene, Texas, US (32.491025, -99.7852) |
| Power capacity | not published MW |
| IT load | not published |
| GPU count | not published |
| Peak PFLOPS (FP16) | not published |
| Owner | Microsoft Corporation |
| Operator | Microsoft Corporation |
| Announced | not published |
| Operational | not published |

Built by Crusoe and originally planned as an expansion to Stargate Abilene for OpenAI and Oracle, this site reportedly now has interest from NVIDIA and Meta but was ultimately acquired by Microsoft.

## Data-quality flags

- source_url_contains_claim_verified

## Cite

> Scrutica, "Crusoe Abilene Expansion" (facility record), https://scrutica.com/facilities/fac-epoch-crusoe-abilene-expansion; data source: epoch-ai; accessed 2026-07-27.

Full interactive record: https://scrutica.com/facilities/fac-epoch-crusoe-abilene-expansion · Methodology for derived values: https://scrutica.com/methodology#flop-estimation · All programmatic surfaces: https://scrutica.com/agents
