  "_format": "scrutica-export-v1",
  "metadata": {
    "title": "DayOne Nongsa Building 2 Batam: site record",
    "exported_at": "2026-11-20T08:57:06.978Z",
    "page_url": "https://scrutica.com/facilities/fac-dayone-batam-nongsa-bldg2",
    "methodology_url": "https://scrutica.com/methodology",
    "license": "See https://scrutica.com/about for current license terms",
    "citation": "Scrutica (2026). DayOne Nongsa Building 2 Batam: site record. Retrieved November 20, 2026, from https://scrutica.com/facilities/fac-dayone-batam-nongsa-bldg2",
    "record_count": 8,
    "provenance_fields": {
      "is_estimated": "A per-record flag, set by the pipeline step that last wrote it, under that step’s own rule. True means that step judged the record estimated, on grounds that include a modeled, derived or inferred value, an unconfirmed record and a secondary source. False means no such judgment is recorded; it is not a verification. Read the flag with the record’s authority tier.",
      "data_source": "primary data source for this record",
      "source_url": "direct URL to the primary source, when available",
      "authority_tier": "reliability rating: 1=primary filing, 2=research DB, 3=press/analyst, 4=Scrutica-inferred, 5=unverified",
      "estimation_method": "how estimated values were derived (reported, hardware_derived, power_derived, cost_imputed, benchmark_inferred, cross_source_reconciled, editorial, aggregated)",
      "data_vintage": "when the underlying source data was originally produced (not when Scrutica accessed it)"
    },
    "data_sources": [
      {
        "name": "Scrutica facilities substrate (per-row primary citations)",
        "url": "https://scrutica.com/methodology",
        "authority_tier": 1,
        "tier_label": "Primary filing (SEC, government, company disclosure)"
      }
    ]
  },
  "data": [
    {
      "row": "walk_state",
      "anchors_attempted": 1,
      "walks_completed": 1,
      "walk_ran": true,
      "jurisdiction_unrecorded_orgs": 0
    },
    {
      "row": "control_leg",
      "facility_status": "operational",
      "leg": "title",
      "holder": null,
      "holder_org_id": null,
      "role": null,
      "role_qualifier": null,
      "role_scope_extent": null,
      "role_scope": null,
      "role_basis": null,
      "evidence_url": null,
      "evidence_quote": null,
      "evidence_authority_tier": null,
      "recorded_ancestors": null,
      "absence": "A recorded owner attribution to DayOne Data Centers Limited is withheld. The cited source does not establish that this organisation holds title to the site."
    },
    {
      "row": "control_leg",
      "facility_status": "operational",
      "leg": "operation",
      "holder": null,
      "holder_org_id": null,
      "role": null,
      "role_qualifier": null,
      "role_scope_extent": null,
      "role_scope": null,
      "role_basis": null,
      "evidence_url": null,
      "evidence_quote": null,
      "evidence_authority_tier": null,
      "recorded_ancestors": null,
      "absence": "A recorded operator attribution to DayOne Data Centers Limited is withheld. The cited source does not establish that this organisation operates the site."
    },
    {
      "row": "control_leg",
      "facility_status": "operational",
      "leg": "hardware",
      "holder": null,
      "holder_org_id": null,
      "role": null,
      "role_qualifier": null,
      "role_scope_extent": null,
      "role_scope": null,
      "role_basis": null,
      "evidence_url": null,
      "evidence_quote": null,
      "evidence_authority_tier": null,
      "recorded_ancestors": null,
      "absence": "No AI-hardware owner is recorded for this site."
    },
    {
      "row": "recorded_role",
      "organisation": "DayOne Data Centers Limited",
      "recorded_as": "operator",
      "admitted_as": "Recorded operator attribution withheld",
      "role_scope_extent": null,
      "role_scope": null,
      "explanation": "The cited source does not establish that this organisation operates the site.",
      "evidence_url": "https://dayonedc.com/market/batam/",
      "evidence_quote": "As a 72MW data center inside Batam's Nongsa Digital Park Special Economic Zone, DayOne offers direct fibre routes to Singapore and access to over 15 submarine cables."
    },
    {
      "row": "recorded_role",
      "organisation": "DayOne Data Centers Limited",
      "recorded_as": "owner",
      "admitted_as": "Recorded owner attribution withheld",
      "role_scope_extent": null,
      "role_scope": null,
      "explanation": "The cited source does not establish that this organisation holds title to the site.",
      "evidence_url": "https://dayonedc.com/market/batam/",
      "evidence_quote": "DayOne is developing the first operational data center of its kind in Batam. Designed for high-throughput performance, our Nongsa Digital Park (NDP) campus opens in 2025 with low-latency routes into Singapore and onward to the APAC region."
    },
    {
      "row": "constraint",
      "kind": "jurisdiction",
      "headline": "A company in the ownership chain is headquartered in Singapore",
      "detail": "Singapore: Not a Wassenaar participant; Singapore Customs administers the Strategic Goods (Control) Act, which incorporates Wassenaar / NSG / MTCR / AG dual-use lists by reference. Export-control regimes listed for this jurisdiction: Singapore Strategic Goods (Control) Act.",
      "attaches_to": "Singapore",
      "hops_above_site": 1,
      "reached_through": "association",
      "as_of": null,
      "citation": null,
      "source_url": null
    },
    {
      "row": "facility_description",
      "description": "Building 2 at the Nongsa Digital Park campus, Batam, Indonesia. Per DayOne's Batam market page (accessed 2026-07-18): 'Just across the strait from Singapore, Batam offers direct fibre routes, cost-efficient operations, and streamlined regulatory support'; 'As a 72MW data center inside Batam's Nongsa Digital Park Special Economic Zone, DayOne offers direct fibre routes to Singapore and access to over 15 submarine cables.' Campus totals per the same page: 68,812 sqm gross floor area, 72 MW total capacity, RFS 2025 onwards. Per-building capacity not disclosed.",
      "source": "dayone-corporate-site-2026-05",
      "source_url": "https://dayonedc.com/market/batam/"
    }
  ]
}