{"program_id":"fr","program_name":"France: France 2030 / AI Action Summit / GENCI / Mistral Compute / SoftBank Hauts-de-France","as_of":"2026-08-15T02:38:24.692Z","schema_version":"1.0","stages":{"announced":{"value_usd":2700000000,"is_estimated":true,"currency_of_record":"USD","fx_rate_used":null,"fx_rate_source":null,"fx_rate_date":null,"primary_sources":[{"url":"https://group.softbank/en/news/press/20260531_0","description":"SoftBank France AI data center campus: up to EUR75B/5GW, Phase 1 firm EUR45B/3.1GW Hauts-de-France by 2031 (group.softbank, 2026-05-31) — retrieved from the publisher's own site","authority_tier":1,"accessed_date":"2026-07-14"},{"url":"https://tech-insider.org/mistral-ai-830-million-debt-financing-nvidia-paris-data-center-2026/","description":"Mistral $830M debt financing and DC","authority_tier":2},{"url":"https://www.genci.fr/en/news/genci-and-cnrs-choose-eviden-make-jean-zay-supercomputer-one-most-powerful-france","description":"GENCI official: €40M contract, H100 deployment","authority_tier":1,"accessed_date":"2026-03-28"},{"url":"https://www.cnrs.fr/en/press/jean-zay-supercomputer-france-has-increased-its-ai-dedicated-resources-fourfold","description":"CNRS confirms fourfold increase in AI resources","authority_tier":1,"accessed_date":"2026-03-28"},{"url":"https://www.elysee.fr/en/sommet-pour-l-action-sur-l-ia","description":"Official Élysée AI Action Summit page","authority_tier":1,"accessed_date":"2026-03-28"},{"url":"https://www.csis.org/analysis/frances-ai-action-summit","description":"CSIS breakdown confirming €109B is private investment","authority_tier":2,"accessed_date":"2026-03-28"},{"url":"https://www.datacenterdynamics.com/en/news/eviden-to-upgrade-frances-jean-zay-supercomputer-with-nvidia-h100-gpus/","description":"Data Centre Dynamics: Eviden contract details","authority_tier":2,"accessed_date":"2026-03-28"}]},"committed":{"value_usd":2700000000,"is_estimated":true,"currency_of_record":"USD","fx_rate_used":null,"fx_rate_source":null,"fx_rate_date":null,"primary_sources":[{"url":"https://group.softbank/en/news/press/20260531_0","description":"SoftBank France AI data center campus: up to EUR75B/5GW, Phase 1 firm EUR45B/3.1GW Hauts-de-France by 2031 (group.softbank, 2026-05-31) — retrieved from the publisher's own site","authority_tier":1,"accessed_date":"2026-07-14"},{"url":"https://tech-insider.org/mistral-ai-830-million-debt-financing-nvidia-paris-data-center-2026/","description":"Mistral $830M debt financing and DC","authority_tier":2},{"url":"https://www.genci.fr/en/news/genci-and-cnrs-choose-eviden-make-jean-zay-supercomputer-one-most-powerful-france","description":"GENCI official: €40M contract, H100 deployment","authority_tier":1,"accessed_date":"2026-03-28"},{"url":"https://www.cnrs.fr/en/press/jean-zay-supercomputer-france-has-increased-its-ai-dedicated-resources-fourfold","description":"CNRS confirms fourfold increase in AI resources","authority_tier":1,"accessed_date":"2026-03-28"},{"url":"https://www.elysee.fr/en/sommet-pour-l-action-sur-l-ia","description":"Official Élysée AI Action Summit page","authority_tier":1,"accessed_date":"2026-03-28"},{"url":"https://www.csis.org/analysis/frances-ai-action-summit","description":"CSIS breakdown confirming €109B is private investment","authority_tier":2,"accessed_date":"2026-03-28"},{"url":"https://www.datacenterdynamics.com/en/news/eviden-to-upgrade-frances-jean-zay-supercomputer-with-nvidia-h100-gpus/","description":"Data Centre Dynamics: Eviden contract details","authority_tier":2,"accessed_date":"2026-03-28"}]},"disbursed":{"value_usd":43600000,"is_estimated":true,"currency_of_record":"USD","fx_rate_used":null,"fx_rate_source":null,"fx_rate_date":null,"primary_sources":[{"url":"https://group.softbank/en/news/press/20260531_0","description":"SoftBank France AI data center campus: up to EUR75B/5GW, Phase 1 firm EUR45B/3.1GW Hauts-de-France by 2031 (group.softbank, 2026-05-31) — retrieved from the publisher's own site","authority_tier":1,"accessed_date":"2026-07-14"},{"url":"https://tech-insider.org/mistral-ai-830-million-debt-financing-nvidia-paris-data-center-2026/","description":"Mistral $830M debt financing and DC","authority_tier":2},{"url":"https://www.genci.fr/en/news/genci-and-cnrs-choose-eviden-make-jean-zay-supercomputer-one-most-powerful-france","description":"GENCI official: €40M contract, H100 deployment","authority_tier":1,"accessed_date":"2026-03-28"},{"url":"https://www.cnrs.fr/en/press/jean-zay-supercomputer-france-has-increased-its-ai-dedicated-resources-fourfold","description":"CNRS confirms fourfold increase in AI resources","authority_tier":1,"accessed_date":"2026-03-28"},{"url":"https://www.elysee.fr/en/sommet-pour-l-action-sur-l-ia","description":"Official Élysée AI Action Summit page","authority_tier":1,"accessed_date":"2026-03-28"},{"url":"https://www.csis.org/analysis/frances-ai-action-summit","description":"CSIS breakdown confirming €109B is private investment","authority_tier":2,"accessed_date":"2026-03-28"},{"url":"https://www.datacenterdynamics.com/en/news/eviden-to-upgrade-frances-jean-zay-supercomputer-with-nvidia-h100-gpus/","description":"Data Centre Dynamics: Eviden contract details","authority_tier":2,"accessed_date":"2026-03-28"}]},"deployed":{"value_usd":43600000,"is_estimated":true,"currency_of_record":"USD","fx_rate_used":null,"fx_rate_source":null,"fx_rate_date":null,"primary_sources":[{"url":"https://group.softbank/en/news/press/20260531_0","description":"SoftBank France AI data center campus: up to EUR75B/5GW, Phase 1 firm EUR45B/3.1GW Hauts-de-France by 2031 (group.softbank, 2026-05-31) — retrieved from the publisher's own site","authority_tier":1,"accessed_date":"2026-07-14"},{"url":"https://tech-insider.org/mistral-ai-830-million-debt-financing-nvidia-paris-data-center-2026/","description":"Mistral $830M debt financing and DC","authority_tier":2},{"url":"https://www.genci.fr/en/news/genci-and-cnrs-choose-eviden-make-jean-zay-supercomputer-one-most-powerful-france","description":"GENCI official: €40M contract, H100 deployment","authority_tier":1,"accessed_date":"2026-03-28"},{"url":"https://www.cnrs.fr/en/press/jean-zay-supercomputer-france-has-increased-its-ai-dedicated-resources-fourfold","description":"CNRS confirms fourfold increase in AI resources","authority_tier":1,"accessed_date":"2026-03-28"},{"url":"https://www.elysee.fr/en/sommet-pour-l-action-sur-l-ia","description":"Official Élysée AI Action Summit page","authority_tier":1,"accessed_date":"2026-03-28"},{"url":"https://www.csis.org/analysis/frances-ai-action-summit","description":"CSIS breakdown confirming €109B is private investment","authority_tier":2,"accessed_date":"2026-03-28"},{"url":"https://www.datacenterdynamics.com/en/news/eviden-to-upgrade-frances-jean-zay-supercomputer-with-nvidia-h100-gpus/","description":"Data Centre Dynamics: Eviden contract details","authority_tier":2,"accessed_date":"2026-03-28"}],"derivation_rule":"MIN(committed_usd, disbursed_usd, utility_evidence_ceiling_usd) over non-null inputs","inputs":{"committed_usd":2700000000,"disbursed_usd":43600000,"utility_evidence_count":0,"utility_evidence_ceiling_usd":null,"composite_authority_tier":null}}},"structural_non_disclosure":false,"structural_non_disclosure_reason":null,"empanelled_partners":[{"partner_name":"GENCI","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-additional-ai-factories-strengthen-europes-ai-leadership-2025-03-12_en","authority_tier":1,"vintage":"2025-03-12","notes":"Named as French Hosting Entity for AI Factory France (AI2F) in the EuroHPC JU March 2025 AI Factories selection announcement. Operates Jean Zay (IDRIS/CNRS), Adastra (CINES), and Joliot-Curie (TGCC/CEA) on behalf of the consortium.","partner_canonical_org_id":"org-empanelled-genci","partner_name_source_form":"Grand Équipement National de Calcul Intensif","allocation_stage":"commissioned","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"CNRS","gpu_count":1456,"gpu_model":"NVIDIA H100","contract_award_url":"https://www.genci.fr/en/news/genci-and-cnrs-choose-eviden-make-jean-zay-supercomputer-one-most-powerful-france","authority_tier":1,"vintage":"2024-03-28","notes":"Named as co-procuring entity with GENCI for Jean Zay expansion (2024). The GENCI/CNRS press release states 1,456 NVIDIA H100 GPUs were added in the 2024 extension, installed by Eviden, becoming available summer 2024. Also named AI2F consortium member in March 2025 EuroHPC selection.","partner_canonical_org_id":"org-cnrs","partner_name_source_form":"Centre National de la Recherche Scientifique","allocation_stage":"commissioned"},{"partner_name":"Inria","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.genci.fr/en/news/what-ai-factory-france","authority_tier":1,"vintage":"2025-09-16","notes":"Named as AI2F consortium partner and co-pilot of the project alongside GENCI. Source: GENCI official AI2F description page listing consortium members verbatim.","partner_canonical_org_id":"org-inria","allocation_stage":"commissioned","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"CEA","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.genci.fr/en/news/what-ai-factory-france","authority_tier":1,"vintage":"2025-09-16","notes":"Named AI2F consortium member; operates Joliot-Curie at TGCC as one of three French supercomputers accessible through the AI2F.","partner_canonical_org_id":"org-empanelled-cea","partner_name_source_form":"Commissariat à l'énergie atomique et aux énergies alternatives","allocation_stage":"commissioned","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"CINES","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.genci.fr/en/news/what-ai-factory-france","authority_tier":1,"vintage":"2025-09-16","notes":"Named AI2F consortium member; operates Adastra supercomputer, which is one of the three GENCI-owned facilities offered through AI2F.","partner_canonical_org_id":"org-empanelled-cines","partner_name_source_form":"Centre Informatique National de l'Enseignement Supérieur","allocation_stage":"commissioned","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"AMIAD","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.genci.fr/en/news/what-ai-factory-france","authority_tier":1,"vintage":"2025-09-16","notes":"Named AI2F consortium partner, listed verbatim in GENCI's official AI2F description alongside CNRS, CEA, CINES, Inria, HubFranceIA, Mission French Tech, Station-F, France Universités. Role not further specified in source.","partner_canonical_org_id":"org-empanelled-amiad","allocation_stage":"commissioned","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"France Universités","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.genci.fr/en/news/what-ai-factory-france","authority_tier":1,"vintage":"2025-09-16","notes":"Named AI2F consortium partner representing 74 French universities. Source states 'France Universités (FU) representing the 74 French universities' verbatim.","partner_canonical_org_id":"org-empanelled-france-universites","allocation_stage":"commissioned","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"HubFranceIA","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.genci.fr/en/news/what-ai-factory-france","authority_tier":1,"vintage":"2025-09-16","notes":"Named AI2F consortium partner, listed verbatim in GENCI official description.","partner_canonical_org_id":"org-empanelled-hubfranceia","allocation_stage":"commissioned","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"Mission French Tech","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.genci.fr/en/news/what-ai-factory-france","authority_tier":1,"vintage":"2025-09-16","notes":"Named AI2F consortium partner, listed verbatim in GENCI official description.","partner_canonical_org_id":"org-empanelled-mission-french-tech","allocation_stage":"commissioned","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"Station-F","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.genci.fr/en/news/what-ai-factory-france","authority_tier":1,"vintage":"2025-09-16","notes":"Named AI2F consortium partner, listed verbatim in GENCI official description.","partner_canonical_org_id":"org-sec-station-a-llc-us","allocation_stage":"commissioned","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"Eviden","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.genci.fr/en/news/genci-and-cnrs-choose-eviden-make-jean-zay-supercomputer-one-most-powerful-france","authority_tier":1,"vintage":"2024-03-28","notes":"Selected by GENCI and CNRS through competitive dialogue to supply and integrate the 2024 Jean Zay extension (1,456 NVIDIA H100 GPUs in 14 BullSequana XH3000 racks). Atos Group company named verbatim in the GENCI/CNRS joint press release.","partner_canonical_org_id":"org-eviden","allocation_stage":"awarded","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"Mistral AI","gpu_count":null,"gpu_model":"NVIDIA Grace Blackwell","contract_award_url":"https://mistral.ai/news/mistral-compute","authority_tier":1,"vintage":"2025-02-10","notes":"Mistral AI announced 'Mistral Compute' at the AI Action Summit (February 2025), offering NVIDIA-accelerated compute; named as one of four joint-venture founders (alongside MGX, Bpifrance, NVIDIA) for a planned 1.4 GW AI campus in France. GPU count 'tens of thousands' stated in source; no per-partner breakdown disclosed. Source does not state a specific integer count.","partner_canonical_org_id":"org-mistral","allocation_stage":"announced","data_quality_flags":["pre_tender_announcement","aggregate_only_disclosure"]},{"partner_name":"Bpifrance","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.polytechnique.edu/en/press-room/press-releases/mgx-bpifrance-mistral-ai-and-nvidia-launch-joint-venture-build-europes-largest-ai-campus-france","authority_tier":2,"vintage":"2025-02-10","notes":"Named as co-founder of joint venture with MGX, Mistral AI, and NVIDIA to build AI campus (1.4 GW aspirational; construction H2 2026). Source: École Polytechnique press release citing the joint venture announcement.","partner_canonical_org_id":"22261.0","allocation_stage":"announced","data_quality_flags":["pre_tender_announcement","aggregate_only_disclosure"]},{"partner_name":"MGX","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.polytechnique.edu/en/press-room/press-releases/mgx-bpifrance-mistral-ai-and-nvidia-launch-joint-venture-build-europes-largest-ai-campus-france","authority_tier":2,"vintage":"2025-02-10","notes":"UAE AI investment fund named as co-founder of joint venture for France AI campus. Source: École Polytechnique press release.","partner_canonical_org_id":"590511-25","allocation_stage":"announced","data_quality_flags":["pre_tender_announcement","aggregate_only_disclosure"]},{"partner_name":"NVIDIA","gpu_count":null,"gpu_model":null,"contract_award_url":"https://mistral.ai/news/mistral-compute","authority_tier":1,"vintage":"2025-02-10","notes":"Named as 'premier NVIDIA partner' compute supplier for Mistral Compute and co-founder of joint-venture AI campus; also GPU hardware supplier for Jean Zay extension (H100, A100, V100). Source does not itemize per-partner GPU counts.","partner_canonical_org_id":"org-nvidia","allocation_stage":"awarded","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"IA Cluster: PR[AI]RIE – PSAI","gpu_count":null,"gpu_model":null,"contract_award_url":"https://anr.fr/actualites-de-lanr/details/news/intelligence-artificielle-9-nouveaux-ia-clusters-et-2-nouveaux-laureats-competences-et-metie/","authority_tier":1,"vintage":"2024-05-22","notes":"Announced 22 May 2024 by President Macron at Vivatech; led by Université Paris Sciences et Lettres. Awarded €75M from France 2030 IA Cluster program. Source: ANR official announcement listing all 9 laureates verbatim.","partner_canonical_org_id":"org-empanelled-ia-cluster-prairie-psai","allocation_stage":"awarded","usd_allocation":75000000},{"partner_name":"IA Cluster: MIAI Cluster","gpu_count":null,"gpu_model":null,"contract_award_url":"https://anr.fr/actualites-de-lanr/details/news/intelligence-artificielle-9-nouveaux-ia-clusters-et-2-nouveaux-laureats-competences-et-metie/","authority_tier":1,"vintage":"2024-05-22","notes":"Led by Université Grenoble Alpes; awarded €70M. Named verbatim in ANR May 2024 official announcement.","partner_canonical_org_id":"org-empanelled-ia-cluster-miai-cluster","allocation_stage":"awarded","usd_allocation":70000000},{"partner_name":"IA Cluster: Hi! PARIS Cluster 2030","gpu_count":null,"gpu_model":null,"contract_award_url":"https://anr.fr/actualites-de-lanr/details/news/intelligence-artificielle-9-nouveaux-ia-clusters-et-2-nouveaux-laureats-competences-et-metie/","authority_tier":1,"vintage":"2024-05-22","notes":"Led by Institut Polytechnique de Paris with HEC Paris, Inria, CNRS; awarded €70M. Named verbatim in ANR May 2024 announcement.","partner_canonical_org_id":"org-empanelled-ia-cluster-hi-paris-cluster-2030","allocation_stage":"awarded","usd_allocation":70000000},{"partner_name":"IA Cluster: PostGenAI@PARIS","gpu_count":null,"gpu_model":null,"contract_award_url":"https://anr.fr/actualites-de-lanr/details/news/intelligence-artificielle-9-nouveaux-ia-clusters-et-2-nouveaux-laureats-competences-et-metie/","authority_tier":1,"vintage":"2024-05-22","notes":"Led by Sorbonne Université; awarded €35M. Named verbatim in ANR May 2024 announcement.","partner_canonical_org_id":"org-empanelled-ia-cluster-postgenaiparis","allocation_stage":"awarded","usd_allocation":35000000},{"partner_name":"IA Cluster: ENACT","gpu_count":null,"gpu_model":null,"contract_award_url":"https://anr.fr/actualites-de-lanr/details/news/intelligence-artificielle-9-nouveaux-ia-clusters-et-2-nouveaux-laureats-competences-et-metie/","authority_tier":1,"vintage":"2024-05-22","notes":"Led by Université de Lorraine; awarded €30M. Named verbatim in ANR May 2024 announcement.","partner_canonical_org_id":"org-empanelled-ia-cluster-enact","allocation_stage":"awarded","usd_allocation":30000000},{"partner_name":"IA Cluster: DATAIA-Cluster","gpu_count":null,"gpu_model":null,"contract_award_url":"https://anr.fr/actualites-de-lanr/details/news/intelligence-artificielle-9-nouveaux-ia-clusters-et-2-nouveaux-laureats-competences-et-metie/","authority_tier":1,"vintage":"2024-05-22","notes":"Led by Université Paris Saclay; awarded €20M. Named verbatim in ANR May 2024 announcement.","partner_canonical_org_id":"org-empanelled-ia-cluster-dataia-cluster","allocation_stage":"awarded","usd_allocation":20000000},{"partner_name":"IA Cluster: ANITI IA Cluster","gpu_count":null,"gpu_model":null,"contract_award_url":"https://anr.fr/actualites-de-lanr/details/news/intelligence-artificielle-9-nouveaux-ia-clusters-et-2-nouveaux-laureats-competences-et-metie/","authority_tier":1,"vintage":"2024-05-22","notes":"Led by Université de Toulouse; awarded €20M. Named verbatim in ANR May 2024 announcement.","partner_canonical_org_id":"org-empanelled-ia-cluster-aniti-ia-cluster","allocation_stage":"awarded","usd_allocation":20000000},{"partner_name":"IA Cluster: 3IA Côte d'Azur 2030","gpu_count":null,"gpu_model":null,"contract_award_url":"https://anr.fr/actualites-de-lanr/details/news/intelligence-artificielle-9-nouveaux-ia-clusters-et-2-nouveaux-laureats-competences-et-metie/","authority_tier":1,"vintage":"2024-05-22","notes":"Led by Université Côte d'Azur; awarded €20M. Named verbatim in ANR May 2024 announcement.","partner_canonical_org_id":"org-empanelled-ia-cluster-3ia-cote-dazur-2030","allocation_stage":"awarded","usd_allocation":20000000},{"partner_name":"IA Cluster: SequoIA","gpu_count":null,"gpu_model":null,"contract_award_url":"https://anr.fr/actualites-de-lanr/details/news/intelligence-artificielle-9-nouveaux-ia-clusters-et-2-nouveaux-laureats-competences-et-metie/","authority_tier":1,"vintage":"2024-05-22","notes":"Led by Université de Rennes; awarded €20M. Named verbatim in ANR May 2024 announcement.","partner_canonical_org_id":"org-empanelled-ia-cluster-sequoia","allocation_stage":"awarded","usd_allocation":20000000}],"data_quality_flags":["The €109B figure invites a conflation and the record separates the two sides: it includes private-sector pledges, and no government-only portion is broken out. Government AI spend since 2018 is approximately EUR 2.5B cumulative.","Verified: the EUR 40M Jean Zay contract, 1,456 H100 GPUs, and the May 2025 inauguration.","The figure of 1.2 million GPUs by 2030 is unverified: no official government source has been identified for it.","Mistral Compute runs 13,800 NVIDIA GB300 GPUs in a 44 MW data center at Bruyères-le-Châtel (Essonne), on $830M of debt financing from seven European banks, dated 30 March 2026. Primary reporting from CNBC, DCD and EU-Startups converged on 13,800; the previously cited 13,800-18,000 range collapsed to 13,800 on that convergence.","Scaleway: first European Blackwell Ultra B300 provider","ASML is largest shareholder in Mistral (11%)","Ministry of Armed Forces selected Mistral for defense AI integration","FX provenance, settled 2026-05-08: the announced total of $114B is a USD-native sum of its components — $2.7B of government France 2030 money, $38B for the UAE data-center campus, $21.8B from Brookfield, and $51.475B of other private money, each press-attributed in USD. It is not a converted figure from the €109B Macron headline, which is editorial parallel framing rather than the source of truth. The currency of record is therefore USD, with no FX conversion recorded: there is no single-date-sourceable rate to document. The €109B and $114B framings differ by approximately 1.4% (against the ECB rate of 1.0312 USD/EUR on 10 February 2025, €109B is $112.4B), a difference between USD-native press aggregation and EUR headline conversion. Government cumulative spend since 2018 (€2.5B, carried as $2.7B in the government-only figure) uses an implicit multi-year average rate that is not single-date-sourceable; it is surfaced here rather than fabricated as a single FX rate.","Update, 2026-07-14, on SoftBank's Hauts-de-France investment: the SoftBank press release (group.softbank, tier 1, retrieved from the publisher's own site, dated 2026-05-31) confirms an 'investment of up to EUR75 billion. The first phase, comprising an initial EUR45 billion investment to deliver 3.1 GW of AI data center capacity in the Hauts-de-France region by 2031, with data centers in Dunkirk (Loon-Plage), Bosquel and Bouchain' and 'up to 5 GW of AI data center capacity in France' overall. The FX rate applied is EUR/USD 1.1646, the ECB reference rate for 2026-06-01 — the nearest ECB business day to the Sunday 2026-05-31 release, and 2026-05-29 was 1.1644, essentially identical. The aspirational EUR75B, or $87.345B, is added to the decomposition and to the announced total, mirroring this record's own precedent of counting aspirational totals in the announced figure while flagging the firm sub-portion separately, as already done for the UAE data-center campus and Brookfield entries above. The firm Phase 1 commitment is EUR45B, or $52.41B, for 3.1 GW by 2031; that firmer figure is not separately added to the committed total, which here tracks government-only committed spend per this record's existing convention, SoftBank's commitment being private foreign direct investment already captured in the decomposition entry.","Update, 2026-07-14, on France 2030's additional EUR655M, which is not added to the government-only figure because of a reconciliation risk: Prime Minister Sébastien Lecornu announced an additional EUR655M via France 2030 on 2026-06-16, ahead of VivaTech, aimed at AI Gigafactories and PIIEC support, per five independent converging French outlets — publicsenat.fr, laminute.info, cryptoast.fr, kulturegeek.fr and lagazettefrance.fr, all reporting identical figures, date and context. The gouvernement.fr primary (info.gouv.fr/actualite/accelerer-l-ia-dans-l-etat-et-au-service-des-francais) returns 403 Forbidden to automated retrieval, consistent with the known fetch constraint on French government sites. Converted at EUR/USD 1.1594, the ECB rate for 2026-06-16, EUR655M would be approximately $759.4M. It is not folded into the government-only figure of $2.7B, framed as cumulative since 2018, because whether it is genuinely incremental or restates money already inside that cumulative figure is unresolved — flagged here rather than risking a double-count.","Update, 2026-07-14, on Mistral and Eclairion at Bruyères-le-Châtel — a status change only, with no change to the accelerator count: aichatdaily.com, dated 2026-06-18 and at tier 3, reports that the 44MW facility 'is operational with 18,000 NVIDIA GB200 systems.' The hardware status above moves from procurement-active to operational on that single tier-3 source, the facility already being on record, which makes this a status update rather than a new claim. The accelerator count in the same article, 18,000 GB200, is not applied: it conflicts with this record's own prior validation, described in the GB300 entry above, where the previously cited 13,800-18,000 range collapsed to 13,800 after CNBC, DCD and EU-Startups converged. One weak tier-3 source recycling the rejected number is not grounds to reopen a settled multi-source validation, and 13,800 GB300 is retained."],"last_validated_at":"2026-08-15"}