{"program_id":"eurohpc","program_name":"EU-Wide: EuroHPC Joint Undertaking","as_of":"2026-08-15T02:40:21.273Z","schema_version":"1.0","stages":{"announced":{"value_usd":10957685000,"is_estimated":true,"currency_of_record":null,"fx_rate_used":null,"fx_rate_source":null,"fx_rate_date":null,"primary_sources":[{"url":"https://www.eurohpc-ju.europa.eu/inauguration-sol-new-quantum-computer-together-lisa-upgrade-leonardo-supercomputer-2026-06-11_en","description":"LISA upgrade inauguration (1,328 H100 GPUs, EUR 50M, 2026-06-11) — retrieved from the publisher's own site","authority_tier":1,"accessed_date":"2026-07-14"},{"url":"https://www.eurohpc-ju.europa.eu/jupiter-officially-propels-europe-exascale-era-2025-11-17_en","description":"JUPITER exascale announcement","authority_tier":1},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-six-additional-ai-factories-expand-europes-ai-capabilities-2025-10-10_en","description":"EuroHPC AI Factory Wave 3 selection","authority_tier":1},{"url":"https://www.eurohpc-ju.europa.eu/ai-factories_en","description":"EuroHPC AI Factories overview","authority_tier":1,"accessed_date":"2026-03-28"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-joint-undertaking-launches-ai-factories-calls-boost-european-leadership-trustworthy-ai-2024-09-10_en","description":"AI Factories Call launch with budget details","authority_tier":1,"accessed_date":"2026-03-28"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-additional-ai-factories-strengthen-europes-ai-leadership-2025-03-12_en","description":"Wave 2 March 2025 selections","authority_tier":1,"accessed_date":"2026-03-28"}]},"committed":{"value_usd":null,"is_estimated":null,"currency_of_record":null,"fx_rate_used":null,"fx_rate_source":null,"fx_rate_date":null,"primary_sources":[{"url":"https://www.eurohpc-ju.europa.eu/inauguration-sol-new-quantum-computer-together-lisa-upgrade-leonardo-supercomputer-2026-06-11_en","description":"LISA upgrade inauguration (1,328 H100 GPUs, EUR 50M, 2026-06-11) — retrieved from the publisher's own site","authority_tier":1,"accessed_date":"2026-07-14"},{"url":"https://www.eurohpc-ju.europa.eu/jupiter-officially-propels-europe-exascale-era-2025-11-17_en","description":"JUPITER exascale announcement","authority_tier":1},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-six-additional-ai-factories-expand-europes-ai-capabilities-2025-10-10_en","description":"EuroHPC AI Factory Wave 3 selection","authority_tier":1},{"url":"https://www.eurohpc-ju.europa.eu/ai-factories_en","description":"EuroHPC AI Factories overview","authority_tier":1,"accessed_date":"2026-03-28"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-joint-undertaking-launches-ai-factories-calls-boost-european-leadership-trustworthy-ai-2024-09-10_en","description":"AI Factories Call launch with budget details","authority_tier":1,"accessed_date":"2026-03-28"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-additional-ai-factories-strengthen-europes-ai-leadership-2025-03-12_en","description":"Wave 2 March 2025 selections","authority_tier":1,"accessed_date":"2026-03-28"}]},"disbursed":{"value_usd":null,"is_estimated":null,"currency_of_record":null,"fx_rate_used":null,"fx_rate_source":null,"fx_rate_date":null,"primary_sources":[{"url":"https://www.eurohpc-ju.europa.eu/inauguration-sol-new-quantum-computer-together-lisa-upgrade-leonardo-supercomputer-2026-06-11_en","description":"LISA upgrade inauguration (1,328 H100 GPUs, EUR 50M, 2026-06-11) — retrieved from the publisher's own site","authority_tier":1,"accessed_date":"2026-07-14"},{"url":"https://www.eurohpc-ju.europa.eu/jupiter-officially-propels-europe-exascale-era-2025-11-17_en","description":"JUPITER exascale announcement","authority_tier":1},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-six-additional-ai-factories-expand-europes-ai-capabilities-2025-10-10_en","description":"EuroHPC AI Factory Wave 3 selection","authority_tier":1},{"url":"https://www.eurohpc-ju.europa.eu/ai-factories_en","description":"EuroHPC AI Factories overview","authority_tier":1,"accessed_date":"2026-03-28"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-joint-undertaking-launches-ai-factories-calls-boost-european-leadership-trustworthy-ai-2024-09-10_en","description":"AI Factories Call launch with budget details","authority_tier":1,"accessed_date":"2026-03-28"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-additional-ai-factories-strengthen-europes-ai-leadership-2025-03-12_en","description":"Wave 2 March 2025 selections","authority_tier":1,"accessed_date":"2026-03-28"}]},"deployed":{"value_usd":null,"is_estimated":null,"currency_of_record":null,"fx_rate_used":null,"fx_rate_source":null,"fx_rate_date":null,"primary_sources":[{"url":"https://www.eurohpc-ju.europa.eu/inauguration-sol-new-quantum-computer-together-lisa-upgrade-leonardo-supercomputer-2026-06-11_en","description":"LISA upgrade inauguration (1,328 H100 GPUs, EUR 50M, 2026-06-11) — retrieved from the publisher's own site","authority_tier":1,"accessed_date":"2026-07-14"},{"url":"https://www.eurohpc-ju.europa.eu/jupiter-officially-propels-europe-exascale-era-2025-11-17_en","description":"JUPITER exascale announcement","authority_tier":1},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-six-additional-ai-factories-expand-europes-ai-capabilities-2025-10-10_en","description":"EuroHPC AI Factory Wave 3 selection","authority_tier":1},{"url":"https://www.eurohpc-ju.europa.eu/ai-factories_en","description":"EuroHPC AI Factories overview","authority_tier":1,"accessed_date":"2026-03-28"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-joint-undertaking-launches-ai-factories-calls-boost-european-leadership-trustworthy-ai-2024-09-10_en","description":"AI Factories Call launch with budget details","authority_tier":1,"accessed_date":"2026-03-28"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-additional-ai-factories-strengthen-europes-ai-leadership-2025-03-12_en","description":"Wave 2 March 2025 selections","authority_tier":1,"accessed_date":"2026-03-28"}],"derivation_rule":"MIN(committed_usd, disbursed_usd, utility_evidence_ceiling_usd) over non-null inputs","inputs":{"committed_usd":null,"disbursed_usd":null,"utility_evidence_count":0,"utility_evidence_ceiling_usd":null,"composite_authority_tier":null}}},"structural_non_disclosure":false,"structural_non_disclosure_reason":null,"empanelled_partners":[{"partner_name":"CSC – IT Center for Science (LUMI AI Factory, Finland — Round 1)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/selection-first-seven-ai-factories-drive-europes-leadership-ai-2024-12-10_en","authority_tier":1,"vintage":"2024-12-10","notes":"Round 1. Consortium: CZ, DK, EE, NO, PL.","partner_canonical_org_id":"org-empanelled-csc-it-center-for-science","allocation_stage":"empanelled","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"High-Performance Computing Center Stuttgart (HLRS)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/selection-first-seven-ai-factories-drive-europes-leadership-ai-2024-12-10_en","authority_tier":1,"vintage":"2024-12-10","notes":"HammerHAI Round 1. Consortium: GWDG, BADW-LRZ, KIT, SICOS.","partner_canonical_org_id":"org-empanelled-high-performance-computing-center-stuttgart","partner_name_source_form":"Höchstleistungsrechenzentrum Stuttgart","allocation_stage":"empanelled","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"GRNET S.A. (Greece AI Factory, Round 1)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/selection-first-seven-ai-factories-drive-europes-leadership-ai-2024-12-10_en","authority_tier":1,"vintage":"2024-12-10","notes":"Round 1. Consortium: NCSR Demokritos, Athena Research Center, NTUA, National Fund of Greece.","partner_canonical_org_id":"org-empanelled-grnet-sa","allocation_stage":"empanelled","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"CINECA Consorzio Interuniversitario (IT4LIA, Italy — Round 1)","gpu_count":null,"gpu_model":"NVIDIA GB200 NVL4 (Blackwell)","contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-signs-contract-boost-ai-capabilities-it4lia-ai-factory-2026-04-22_en","authority_tier":1,"vintage":"2026-04-22","notes":"Round 1. EUR 290M contract Apr 2026 (E4 + Dell). Consortium: Austria, Slovenia.","partner_canonical_org_id":"org-empanelled-cineca-consorzio-interuniversitario","allocation_stage":"awarded","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"LuxProvide (MeluXina AI Factory, Luxembourg — Round 1)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/selection-first-seven-ai-factories-drive-europes-leadership-ai-2024-12-10_en","authority_tier":1,"vintage":"2024-12-10","notes":"Round 1. Consortium: Luxinnovation, LNDS, Uni.lu, LIST.","partner_canonical_org_id":"org-empanelled-luxprovide","allocation_stage":"empanelled","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"Barcelona Supercomputing Center (BSC-CNS) (Spain AI Factory, Round 1)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/selection-first-seven-ai-factories-drive-europes-leadership-ai-2024-12-10_en","authority_tier":1,"vintage":"2024-12-10","notes":"Round 1. Consortium: FCT (PT), TÜBİTAK (TR), ICI Bucharest (RO).","partner_canonical_org_id":"org-barcelona-supercomputing-center","partner_name_source_form":"Centro Nacional de Supercomputación","allocation_stage":"empanelled","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"NAISS (Mimer AI Factory, Sweden — Round 1)","gpu_count":400,"gpu_model":"NVIDIA GB200","contract_award_url":"https://www.naiss.se/news/2026/04/bull-to-deliver-ai-optimised-supercomputer-for-mimer-ai-factory/","authority_tier":1,"vintage":"2026-04-21","notes":"Round 1. EUR 30M contract Bull/Eviden; 400 GB200 / 100 nodes. Consortium: RISE.","partner_canonical_org_id":"org-empanelled-naiss","allocation_stage":"awarded"},{"partner_name":"TU Wien (Austria AI Factory, Round 2)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-additional-ai-factories-strengthen-europes-ai-leadership-2025-03-12_en","authority_tier":1,"vintage":"2025-03-12","notes":"Round 2 (Mar 2025). Consortium: Advanced Computing Austria (ACA), AIT Austrian Institute of Technology.","partner_canonical_org_id":"org-empanelled-tu-wien","partner_name_source_form":"Technische Universität Wien","allocation_stage":"empanelled","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"Sofia Tech Park (Bulgaria AI Factory, Round 2)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-additional-ai-factories-strengthen-europes-ai-leadership-2025-03-12_en","authority_tier":1,"vintage":"2025-03-12","notes":"Round 2.","partner_canonical_org_id":"org-empanelled-sofia-tech-park","allocation_stage":"empanelled","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"GENCI (France AI Factory, Round 2)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-additional-ai-factories-strengthen-europes-ai-leadership-2025-03-12_en","authority_tier":1,"vintage":"2025-03-12","notes":"Round 2. Consortium: AMIAD, CEA, CINES, CNRS, France Universités, Inria, French Tech, Station-F, HubFranceIA.","partner_canonical_org_id":"org-empanelled-genci","partner_name_source_form":"Grand Équipement National de Calcul Intensif","allocation_stage":"empanelled","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"Forschungszentrum Jülich / Jülich Supercomputing Centre (JUPITER AIF, Germany — Round 2)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-additional-ai-factories-strengthen-europes-ai-leadership-2025-03-12_en","authority_tier":1,"vintage":"2025-03-12","notes":"Round 2. Consortium: RWTH Aachen, Fraunhofer FIT, Fraunhofer IAIS, Hessian Center for AI.","partner_canonical_org_id":"org-empanelled-forschungszentrum-julich-julich-supercomputing-centre","allocation_stage":"empanelled","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"PSNC (PIAST-AI, Poland — Round 2)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-additional-ai-factories-strengthen-europes-ai-leadership-2025-03-12_en","authority_tier":1,"vintage":"2025-03-12","notes":"Round 2. Hosting Agreement Jun 2025. >1,000 GPUs (model unspec); Q3 2026 launch.","partner_canonical_org_id":"org-sec-psnc-cardinal-pipeline-company-us","allocation_stage":"awarded","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"IZUM (Slovenia AI Factory, Round 2)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-additional-ai-factories-strengthen-europes-ai-leadership-2025-03-12_en","authority_tier":1,"vintage":"2025-03-12","notes":"Round 2. Consortium: Jožef Stefan Institute, ARNES, +5 universities.","partner_canonical_org_id":"org-empanelled-izum","partner_name_source_form":"Institut informacijskih znanosti","allocation_stage":"empanelled","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"VSB-TUO / IT4Innovations (CZAI, Czech Republic — Round 3)","gpu_count":340,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-six-additional-ai-factories-expand-europes-ai-capabilities-2025-10-10_en","authority_tier":1,"vintage":"2025-10-10","notes":"Round 3 (Oct 2025). KarolAIna: ~340 AI chips, 850 PFlop/s, EUR ~40M.","partner_canonical_org_id":"org-empanelled-vsb-tuo-it4innovations","partner_name_source_form":"VŠB – Technická univerzita Ostrava","allocation_stage":"empanelled"},{"partner_name":"Vilnius University (LitAI Factory, Lithuania — Round 3)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-six-additional-ai-factories-expand-europes-ai-capabilities-2025-10-10_en","authority_tier":1,"vintage":"2025-10-10","notes":"Round 3. Consortium: KTU, VGTU, VMU, State Data Agency, LRTC, Innovation Agency Lithuania.","partner_canonical_org_id":"org-empanelled-vilnius-university","partner_name_source_form":"Vilniaus universitetas","allocation_stage":"empanelled","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"AIFNL Foundation (NLAIF, Netherlands — Round 3)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-six-additional-ai-factories-expand-europes-ai-capabilities-2025-10-10_en","authority_tier":1,"vintage":"2025-10-10","notes":"Round 3. Consortium: SURF, Samenwerking Noord, TNO, AIC4NL.","partner_canonical_org_id":"org-empanelled-aifnl-foundation","allocation_stage":"empanelled","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"Cyfronet AGH (Gaia AI Factory, Poland — Round 3)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-six-additional-ai-factories-expand-europes-ai-capabilities-2025-10-10_en","authority_tier":1,"vintage":"2025-10-10","notes":"Round 3. Second Polish AI Factory (distinct from PSNC/PIAST-AI Round 2). PLGrid infrastructure.","partner_canonical_org_id":"org-empanelled-cyfronet-agh","partner_name_source_form":"Akademickie Centrum Komputerowe Cyfronet AGH","allocation_stage":"empanelled","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"ICI Bucharest (RO AI Factory, Romania — Round 3)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-six-additional-ai-factories-expand-europes-ai-capabilities-2025-10-10_en","authority_tier":1,"vintage":"2025-10-10","notes":"Round 3. Consortium: Univ. Politehnica Bucharest, TU Cluj-Napoca, Biological Sciences Inst., Transilvania IT Assn., AI Research Inst., Romanian SME Council, Romanian DIH Assn.","partner_canonical_org_id":"org-empanelled-ici-bucharest","partner_name_source_form":"Institutul Național de Cercetare-Dezvoltare în Informatică – ICI București","allocation_stage":"empanelled","data_quality_flags":["aggregate_only_disclosure"]},{"partner_name":"Galicia Supercomputing Center (CESGA) (1HealthAI, Spain — Round 3)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-six-additional-ai-factories-expand-europes-ai-capabilities-2025-10-10_en","authority_tier":1,"vintage":"2025-10-10","notes":"Round 3. Consortium: Galicia 3 universities (CIGUS), DATAlife EDIH, Gradiant.","partner_canonical_org_id":"org-cesga","partner_name_source_form":"Centro de Supercomputación de Galicia","allocation_stage":"empanelled","data_quality_flags":["aggregate_only_disclosure"]}],"data_quality_flags":["The EUR 10B is a seven-year program total and includes pre-AI HPC.","The AI-specific EU contribution, for the AI Factories, is up to EUR 800M, with matching national contributions.","This is a multi-country program; individual country allocations are tracked on the respective country records.","Wave 3 (Oct 2025): Czech Republic, Lithuania, Netherlands, Romania, Spain, Poland (EuroHPC JU, Tier 1)","13 AI Factory Antennas selected (EUR 55M)","JUPITER is operational at 1 ExaFLOP and ranked #4 on the TOP500 in November 2025; both verified.","JUPITER's accelerator count is approximately 24,000 GH200 superchips across approximately 6,000 compute nodes, four per node. Both FZJ and the EuroHPC Joint Undertaking state 'approximately 24,000'; no exact integer is publicly disclosed, so the count is recorded as an estimate.","Update, 2026-07-14: the LISA upgrade (Leonardo Improved Supercomputing Architecture) was inaugurated on 2026-06-11 at DAMA Technopole, Bologna, Italy, alongside the new SOL quantum computer — per the eurohpc-ju.europa.eu event page, tier 1, retrieved from the publisher's own site. It carries 1,328 NVIDIA H100 GPUs across 166 eight-way BullSequana AI 600 servers, at EUR 50M total investment covering acquisition, installation and operations support. It complements IT4LIA, the EuroHPC AI Factory centred on Leonardo, and is expected to be available to users in summer 2026. Converted to USD at EUR/USD 1.1537, the ECB reference rate for 2026-06-11, EUR 50M is approximately $57.7M, which raises both the announced total and the government-only figure from $10.9B to $10.958B. A reported delay of the gigafactory call to July 2026 was not independently verified for this record and is not asserted here."],"last_validated_at":"2026-08-15"}