{"program_id":"eurohpc","program_name":"EU-Wide: EuroHPC Joint Undertaking","as_of":"2026-09-29T06:11:28.329Z","schema_version":"1.0","stages":{"announced":{"value_usd":null,"is_estimated":null,"currency_of_record":null,"fx_rate_used":null,"fx_rate_source":null,"fx_rate_date":null,"primary_sources":[{"url":"https://www.eurohpc-ju.europa.eu/about/discover-eurohpc-ju_en","description":"EuroHPC membership, activities and at least €8.2 billion budget for 2021–27","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/jupiter-officially-propels-europe-exascale-era-2025-11-17_en","description":"JUPITER: November 2025 LINPACK result, TOP500 position and approximate accelerator count","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/inauguration-sol-new-quantum-computer-together-lisa-upgrade-leonardo-supercomputer-2026-06-11_en","description":"LISA inauguration: 166 eight-GPU servers, €50 million scope and expected summer 2026 access","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.cineca.it/en/infrastructure/evolution-infrastructure","description":"CINECA roadmap: Leonardo enhancement and planned LISA capabilities","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/selection-first-seven-ai-factories-drive-europes-leadership-ai-2024-12-10_en","description":"December 2024 selection: seven AI Factory hosts and their consortia","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-additional-ai-factories-strengthen-europes-ai-leadership-2025-03-12_en","description":"March 2025 selection: six AI Factory hosts and their consortia","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-six-additional-ai-factories-expand-europes-ai-capabilities-2025-10-10_en","description":"October 2025 selection: six further AI Factory hosts and their consortia","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-ai-factory-antennas-broaden-ai-factories-initiative-2025-10-13_en","description":"October 2025 selection: 13 Antennas and matched EU funding","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://it4lia-aifactory.eu/news/eurohpc-ju-and-it4lia-ai-factory-a-new-supercomputer-for-italys-ai-future/","description":"April 2026 IT4LIA procurement: E4 and Dell, €290 million budget and GB200 NVL4 design","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.naiss.se/news/2026/04/bull-to-deliver-ai-optimised-supercomputer-for-mimer-ai-factory/","description":"April 2026 MIMER procurement: 400 GB200 GPUs, funding scope and planned installation","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.psnc.pl/the-launch-of-the-first-polish-ai-factory-piast-ai/","description":"June 2025 PIAST-AI hosting agreement, consortium and planned GPU infrastructure","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.psnc.pl/ai-factory-in-action-piast-ai-project-partners-meet-at-pcss/","description":"May 2026 PIAST-AI consortium meeting on GPU procurement and work packages","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://connect.geant.org/2026/06/17/pcss-piast-dynasty-from-the-first-polish-state-to-the-ai-and-quantum-valley","description":"June 2026 account by PSNC staff: new-infrastructure procurement planned for 2027 and full operations for 2028","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.it4i.cz/o-it4i/infoservis/novinky/cesko-ziskalo-svou-tovarnu-na-umelou-inteligenci-a-s-ni-i-novy-ai-superpocitac","description":"IT4Innovations: planned KarolAIna design, approximate chip count and project funding","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://cordis.europa.eu/project/id/101314617","description":"1HealthAI project: CESGA hosting and the One Health consortium","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-joint-undertaking-launches-ai-factories-calls-boost-european-leadership-trustworthy-ai-2024-09-10_en","description":"September 2024 AI supercomputer call: EU funding ceiling and matching national contributions","authority_tier":1,"accessed_date":"2026-09-08"}]},"committed":{"value_usd":null,"is_estimated":null,"currency_of_record":null,"fx_rate_used":null,"fx_rate_source":null,"fx_rate_date":null,"primary_sources":[{"url":"https://www.eurohpc-ju.europa.eu/about/discover-eurohpc-ju_en","description":"EuroHPC membership, activities and at least €8.2 billion budget for 2021–27","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/jupiter-officially-propels-europe-exascale-era-2025-11-17_en","description":"JUPITER: November 2025 LINPACK result, TOP500 position and approximate accelerator count","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/inauguration-sol-new-quantum-computer-together-lisa-upgrade-leonardo-supercomputer-2026-06-11_en","description":"LISA inauguration: 166 eight-GPU servers, €50 million scope and expected summer 2026 access","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.cineca.it/en/infrastructure/evolution-infrastructure","description":"CINECA roadmap: Leonardo enhancement and planned LISA capabilities","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/selection-first-seven-ai-factories-drive-europes-leadership-ai-2024-12-10_en","description":"December 2024 selection: seven AI Factory hosts and their consortia","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-additional-ai-factories-strengthen-europes-ai-leadership-2025-03-12_en","description":"March 2025 selection: six AI Factory hosts and their consortia","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-six-additional-ai-factories-expand-europes-ai-capabilities-2025-10-10_en","description":"October 2025 selection: six further AI Factory hosts and their consortia","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-ai-factory-antennas-broaden-ai-factories-initiative-2025-10-13_en","description":"October 2025 selection: 13 Antennas and matched EU funding","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://it4lia-aifactory.eu/news/eurohpc-ju-and-it4lia-ai-factory-a-new-supercomputer-for-italys-ai-future/","description":"April 2026 IT4LIA procurement: E4 and Dell, €290 million budget and GB200 NVL4 design","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.naiss.se/news/2026/04/bull-to-deliver-ai-optimised-supercomputer-for-mimer-ai-factory/","description":"April 2026 MIMER procurement: 400 GB200 GPUs, funding scope and planned installation","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.psnc.pl/the-launch-of-the-first-polish-ai-factory-piast-ai/","description":"June 2025 PIAST-AI hosting agreement, consortium and planned GPU infrastructure","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.psnc.pl/ai-factory-in-action-piast-ai-project-partners-meet-at-pcss/","description":"May 2026 PIAST-AI consortium meeting on GPU procurement and work packages","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://connect.geant.org/2026/06/17/pcss-piast-dynasty-from-the-first-polish-state-to-the-ai-and-quantum-valley","description":"June 2026 account by PSNC staff: new-infrastructure procurement planned for 2027 and full operations for 2028","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.it4i.cz/o-it4i/infoservis/novinky/cesko-ziskalo-svou-tovarnu-na-umelou-inteligenci-a-s-ni-i-novy-ai-superpocitac","description":"IT4Innovations: planned KarolAIna design, approximate chip count and project funding","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://cordis.europa.eu/project/id/101314617","description":"1HealthAI project: CESGA hosting and the One Health consortium","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-joint-undertaking-launches-ai-factories-calls-boost-european-leadership-trustworthy-ai-2024-09-10_en","description":"September 2024 AI supercomputer call: EU funding ceiling and matching national contributions","authority_tier":1,"accessed_date":"2026-09-08"}]},"disbursed":{"value_usd":null,"is_estimated":null,"currency_of_record":null,"fx_rate_used":null,"fx_rate_source":null,"fx_rate_date":null,"primary_sources":[{"url":"https://www.eurohpc-ju.europa.eu/about/discover-eurohpc-ju_en","description":"EuroHPC membership, activities and at least €8.2 billion budget for 2021–27","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/jupiter-officially-propels-europe-exascale-era-2025-11-17_en","description":"JUPITER: November 2025 LINPACK result, TOP500 position and approximate accelerator count","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/inauguration-sol-new-quantum-computer-together-lisa-upgrade-leonardo-supercomputer-2026-06-11_en","description":"LISA inauguration: 166 eight-GPU servers, €50 million scope and expected summer 2026 access","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.cineca.it/en/infrastructure/evolution-infrastructure","description":"CINECA roadmap: Leonardo enhancement and planned LISA capabilities","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/selection-first-seven-ai-factories-drive-europes-leadership-ai-2024-12-10_en","description":"December 2024 selection: seven AI Factory hosts and their consortia","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-additional-ai-factories-strengthen-europes-ai-leadership-2025-03-12_en","description":"March 2025 selection: six AI Factory hosts and their consortia","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-six-additional-ai-factories-expand-europes-ai-capabilities-2025-10-10_en","description":"October 2025 selection: six further AI Factory hosts and their consortia","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-ai-factory-antennas-broaden-ai-factories-initiative-2025-10-13_en","description":"October 2025 selection: 13 Antennas and matched EU funding","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://it4lia-aifactory.eu/news/eurohpc-ju-and-it4lia-ai-factory-a-new-supercomputer-for-italys-ai-future/","description":"April 2026 IT4LIA procurement: E4 and Dell, €290 million budget and GB200 NVL4 design","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.naiss.se/news/2026/04/bull-to-deliver-ai-optimised-supercomputer-for-mimer-ai-factory/","description":"April 2026 MIMER procurement: 400 GB200 GPUs, funding scope and planned installation","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.psnc.pl/the-launch-of-the-first-polish-ai-factory-piast-ai/","description":"June 2025 PIAST-AI hosting agreement, consortium and planned GPU infrastructure","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.psnc.pl/ai-factory-in-action-piast-ai-project-partners-meet-at-pcss/","description":"May 2026 PIAST-AI consortium meeting on GPU procurement and work packages","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://connect.geant.org/2026/06/17/pcss-piast-dynasty-from-the-first-polish-state-to-the-ai-and-quantum-valley","description":"June 2026 account by PSNC staff: new-infrastructure procurement planned for 2027 and full operations for 2028","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.it4i.cz/o-it4i/infoservis/novinky/cesko-ziskalo-svou-tovarnu-na-umelou-inteligenci-a-s-ni-i-novy-ai-superpocitac","description":"IT4Innovations: planned KarolAIna design, approximate chip count and project funding","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://cordis.europa.eu/project/id/101314617","description":"1HealthAI project: CESGA hosting and the One Health consortium","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-joint-undertaking-launches-ai-factories-calls-boost-european-leadership-trustworthy-ai-2024-09-10_en","description":"September 2024 AI supercomputer call: EU funding ceiling and matching national contributions","authority_tier":1,"accessed_date":"2026-09-08"}]},"deployed":{"value_usd":null,"is_estimated":null,"currency_of_record":null,"fx_rate_used":null,"fx_rate_source":null,"fx_rate_date":null,"primary_sources":[{"url":"https://www.eurohpc-ju.europa.eu/about/discover-eurohpc-ju_en","description":"EuroHPC membership, activities and at least €8.2 billion budget for 2021–27","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/jupiter-officially-propels-europe-exascale-era-2025-11-17_en","description":"JUPITER: November 2025 LINPACK result, TOP500 position and approximate accelerator count","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/inauguration-sol-new-quantum-computer-together-lisa-upgrade-leonardo-supercomputer-2026-06-11_en","description":"LISA inauguration: 166 eight-GPU servers, €50 million scope and expected summer 2026 access","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.cineca.it/en/infrastructure/evolution-infrastructure","description":"CINECA roadmap: Leonardo enhancement and planned LISA capabilities","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/selection-first-seven-ai-factories-drive-europes-leadership-ai-2024-12-10_en","description":"December 2024 selection: seven AI Factory hosts and their consortia","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-additional-ai-factories-strengthen-europes-ai-leadership-2025-03-12_en","description":"March 2025 selection: six AI Factory hosts and their consortia","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-six-additional-ai-factories-expand-europes-ai-capabilities-2025-10-10_en","description":"October 2025 selection: six further AI Factory hosts and their consortia","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-ai-factory-antennas-broaden-ai-factories-initiative-2025-10-13_en","description":"October 2025 selection: 13 Antennas and matched EU funding","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://it4lia-aifactory.eu/news/eurohpc-ju-and-it4lia-ai-factory-a-new-supercomputer-for-italys-ai-future/","description":"April 2026 IT4LIA procurement: E4 and Dell, €290 million budget and GB200 NVL4 design","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.naiss.se/news/2026/04/bull-to-deliver-ai-optimised-supercomputer-for-mimer-ai-factory/","description":"April 2026 MIMER procurement: 400 GB200 GPUs, funding scope and planned installation","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.psnc.pl/the-launch-of-the-first-polish-ai-factory-piast-ai/","description":"June 2025 PIAST-AI hosting agreement, consortium and planned GPU infrastructure","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.psnc.pl/ai-factory-in-action-piast-ai-project-partners-meet-at-pcss/","description":"May 2026 PIAST-AI consortium meeting on GPU procurement and work packages","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://connect.geant.org/2026/06/17/pcss-piast-dynasty-from-the-first-polish-state-to-the-ai-and-quantum-valley","description":"June 2026 account by PSNC staff: new-infrastructure procurement planned for 2027 and full operations for 2028","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.it4i.cz/o-it4i/infoservis/novinky/cesko-ziskalo-svou-tovarnu-na-umelou-inteligenci-a-s-ni-i-novy-ai-superpocitac","description":"IT4Innovations: planned KarolAIna design, approximate chip count and project funding","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://cordis.europa.eu/project/id/101314617","description":"1HealthAI project: CESGA hosting and the One Health consortium","authority_tier":1,"accessed_date":"2026-09-08"},{"url":"https://www.eurohpc-ju.europa.eu/eurohpc-joint-undertaking-launches-ai-factories-calls-boost-european-leadership-trustworthy-ai-2024-09-10_en","description":"September 2024 AI supercomputer call: EU funding ceiling and matching national contributions","authority_tier":1,"accessed_date":"2026-09-08"}],"derivation_rule":"No source-backed valuation of deployed infrastructure is available from the recorded inputs.","inputs":{"committed_usd":null,"disbursed_usd":null,"utility_evidence_count":0,"utility_evidence_ceiling_usd":null,"composite_authority_tier":null}}},"structural_non_disclosure":false,"structural_non_disclosure_reason":null,"empanelled_partners":[{"partner_name":"CSC – IT Center for Science (LUMI AI Factory, Finland — Round 1)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/selection-first-seven-ai-factories-drive-europes-leadership-ai-2024-12-10_en","authority_tier":1,"vintage":"2024-12-10","notes":"CSC leads the LUMI AI Factory in Kajaani, with partners from Finland, Czechia, Denmark, Estonia, Norway and Poland.","partner_canonical_org_id":"org-empanelled-csc-it-center-for-science","allocation_stage":"empanelled"},{"partner_name":"High-Performance Computing Center Stuttgart (HLRS)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/selection-first-seven-ai-factories-drive-europes-leadership-ai-2024-12-10_en","authority_tier":1,"vintage":"2024-12-10","notes":"HLRS leads HammerHAI in Stuttgart, with GWDG, BADW-LRZ, KIT and SICOS as consortium partners.","partner_canonical_org_id":"org-empanelled-high-performance-computing-center-stuttgart","partner_name_source_form":"Höchstleistungsrechenzentrum Stuttgart","allocation_stage":"empanelled"},{"partner_name":"GRNET S.A. (Greece AI Factory, Round 1)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/selection-first-seven-ai-factories-drive-europes-leadership-ai-2024-12-10_en","authority_tier":1,"vintage":"2024-12-10","notes":"GRNET leads Pharos, with NCSR Demokritos, Athena Research Center, NTUA and the National Fund of Greece.","partner_canonical_org_id":"org-empanelled-grnet-sa","allocation_stage":"empanelled"},{"partner_name":"CINECA Consorzio Interuniversitario (IT4LIA, Italy — Round 1)","gpu_count":null,"gpu_model":"NVIDIA GB200 NVL4 (Blackwell)","contract_award_url":"https://it4lia-aifactory.eu/news/eurohpc-ju-and-it4lia-ai-factory-a-new-supercomputer-for-italys-ai-future/","authority_tier":1,"vintage":"2026-04-23","notes":"CINECA will operate the new IT4LIA supercomputer in Bologna. The April 2026 procurement selected E4 and Dell; the €290 million budget is co-funded equally by EuroHPC and Italian funders. Austria and Slovenia joined the original IT4LIA consortium.","partner_canonical_org_id":"org-empanelled-cineca-consorzio-interuniversitario","allocation_stage":"awarded"},{"partner_name":"LuxProvide (MeluXina AI Factory, Luxembourg — Round 1)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/selection-first-seven-ai-factories-drive-europes-leadership-ai-2024-12-10_en","authority_tier":1,"vintage":"2024-12-10","notes":"LuxProvide leads MeluXina-AI in Bissen, with Luxinnovation, Luxembourg National Data Service, the University of Luxembourg and LIST.","partner_canonical_org_id":"org-empanelled-luxprovide","allocation_stage":"empanelled"},{"partner_name":"Barcelona Supercomputing Center (BSC-CNS) (Spain AI Factory, Round 1)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/selection-first-seven-ai-factories-drive-europes-leadership-ai-2024-12-10_en","authority_tier":1,"vintage":"2024-12-10","notes":"BSC leads the Spanish AI Factory with FCT in Portugal, TÜBİTAK in Türkiye and ICI Bucharest in Romania.","partner_canonical_org_id":"org-barcelona-supercomputing-center","partner_name_source_form":"Centro Nacional de Supercomputación","allocation_stage":"empanelled"},{"partner_name":"NAISS (Mimer AI Factory, Sweden — Round 1)","gpu_count":400,"count_evidence":{"qualifier":"reported","basis":"physical_hardware","scope":"Whole MIMER design: 100 nodes with 400 GB200 GPUs. Sweden and EuroHPC each allocate half the computing resources.","source_url":"https://www.naiss.se/news/2026/04/bull-to-deliver-ai-optimised-supercomputer-for-mimer-ai-factory/","authority_tier":1,"source_date":"2026-04-21"},"gpu_model":"NVIDIA GB200","contract_award_url":"https://www.naiss.se/news/2026/04/bull-to-deliver-ai-optimised-supercomputer-for-mimer-ai-factory/","authority_tier":1,"vintage":"2026-04-21","notes":"MIMER’s April 2026 procurement selected Bull to supply 400 GB200 GPUs across 100 nodes. NAISS planned installation in Linköping later in 2026; RISE is its AI Factory partner.","partner_canonical_org_id":"org-empanelled-naiss","allocation_stage":"awarded"},{"partner_name":"TU Wien (Austria AI Factory, Round 2)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-additional-ai-factories-strengthen-europes-ai-leadership-2025-03-12_en","authority_tier":1,"vintage":"2025-03-12","notes":"TU Wien leads AI:AT with Advanced Computing Austria and the AIT Austrian Institute of Technology.","partner_canonical_org_id":"org-empanelled-tu-wien","partner_name_source_form":"Technische Universität Wien","allocation_stage":"empanelled"},{"partner_name":"Sofia Tech Park (Bulgaria AI Factory, Round 2)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-additional-ai-factories-strengthen-europes-ai-leadership-2025-03-12_en","authority_tier":1,"vintage":"2025-03-12","notes":"Sofia Tech Park will host BRAIN++, whose planned Discoverer++ supercomputer will support AI development and testing.","partner_canonical_org_id":"org-empanelled-sofia-tech-park","allocation_stage":"empanelled"},{"partner_name":"GENCI (France AI Factory, Round 2)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-additional-ai-factories-strengthen-europes-ai-leadership-2025-03-12_en","authority_tier":1,"vintage":"2025-03-12","notes":"GENCI leads AI Factory France, with AMIAD, CEA, CINES, CNRS, France Universités, Inria, French Tech, Station F and Hub France IA.","partner_canonical_org_id":"org-empanelled-genci","partner_name_source_form":"Grand Équipement National de Calcul Intensif","allocation_stage":"empanelled"},{"partner_name":"Forschungszentrum Jülich / Jülich Supercomputing Centre (JUPITER AIF, Germany — Round 2)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-additional-ai-factories-strengthen-europes-ai-leadership-2025-03-12_en","authority_tier":1,"vintage":"2025-03-12","notes":"The JUPITER AI Factory combines Jülich’s computing facilities with expertise from RWTH Aachen, Fraunhofer FIT and IAIS, and the Hessian Center for AI.","partner_canonical_org_id":"org-empanelled-forschungszentrum-julich-julich-supercomputing-centre","allocation_stage":"empanelled"},{"partner_name":"PSNC (PIAST-AI, Poland — Round 2)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.psnc.pl/the-launch-of-the-first-polish-ai-factory-piast-ai/","authority_tier":1,"vintage":"2025-06-23","notes":"PSNC signed a hosting agreement in June 2025 and planned more than 1,000 GPUs. A June 2026 account by PSNC staff targets new-infrastructure procurement in 2027 and full operation in 2028.","partner_canonical_org_id":"org-psnc-poland"},{"partner_name":"IZUM (Slovenia AI Factory, Round 2)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-additional-ai-factories-strengthen-europes-ai-leadership-2025-03-12_en","authority_tier":1,"vintage":"2025-03-12","notes":"IZUM leads the Slovenian AI Factory consortium with the Jožef Stefan Institute, ARNES and five universities.","partner_canonical_org_id":"org-empanelled-izum","partner_name_source_form":"Institut informacijskih znanosti","allocation_stage":"empanelled"},{"partner_name":"VSB-TUO / IT4Innovations (CZAI, Czech Republic — Round 3)","gpu_count":340,"count_evidence":{"qualifier":"approximate","basis":"physical_hardware","scope":"Whole planned KarolAIna machine; EuroHPC receives half its computing time and services.","source_url":"https://www.it4i.cz/o-it4i/infoservis/novinky/cesko-ziskalo-svou-tovarnu-na-umelou-inteligenci-a-s-ni-i-novy-ai-superpocitac","authority_tier":1,"source_date":"2025-10-10"},"gpu_model":null,"contract_award_url":"https://www.it4i.cz/o-it4i/infoservis/novinky/cesko-ziskalo-svou-tovarnu-na-umelou-inteligenci-a-s-ni-i-novy-ai-superpocitac","authority_tier":1,"vintage":"2025-10-10","notes":"IT4Innovations plans KarolAIna with approximately 340 AI chips and a target of 850 PFlop/s for AI operations; chip model and numerical precision are unspecified. The approximately €40 million project budget covers the machine and services, funded equally by EuroHPC and Czechia.","partner_canonical_org_id":"org-empanelled-vsb-tuo-it4innovations","partner_name_source_form":"VŠB – Technická univerzita Ostrava","allocation_stage":"empanelled"},{"partner_name":"Vilnius University (LitAI Factory, Lithuania — Round 3)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-six-additional-ai-factories-expand-europes-ai-capabilities-2025-10-10_en","authority_tier":1,"vintage":"2025-10-10","notes":"Vilnius University leads LitAI with Kaunas University of Technology, Vilnius Gediminas Technical University, Vytautas Magnus University, the State Data Agency, LRTC and Innovation Agency Lithuania.","partner_canonical_org_id":"org-empanelled-vilnius-university","partner_name_source_form":"Vilniaus universitetas","allocation_stage":"empanelled"},{"partner_name":"AIFNL Foundation (NLAIF, Netherlands — Round 3)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-six-additional-ai-factories-expand-europes-ai-capabilities-2025-10-10_en","authority_tier":1,"vintage":"2025-10-10","notes":"The AIFNL Foundation leads the Dutch AI Factory consortium with SURF, Samenwerking Noord, TNO and AIC4NL.","partner_canonical_org_id":"org-empanelled-aifnl-foundation","allocation_stage":"empanelled"},{"partner_name":"Cyfronet AGH (Gaia AI Factory, Poland — Round 3)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-six-additional-ai-factories-expand-europes-ai-capabilities-2025-10-10_en","authority_tier":1,"vintage":"2025-10-10","notes":"Cyfronet AGH leads Gaia, the second Polish AI Factory selected by EuroHPC. It will use PLGrid infrastructure.","partner_canonical_org_id":"org-empanelled-cyfronet-agh","partner_name_source_form":"Akademickie Centrum Komputerowe Cyfronet AGH","allocation_stage":"empanelled"},{"partner_name":"ICI Bucharest (RO AI Factory, Romania — Round 3)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-six-additional-ai-factories-expand-europes-ai-capabilities-2025-10-10_en","authority_tier":1,"vintage":"2025-10-10","notes":"ICI Bucharest leads RO AI with Politehnica Bucharest, TU Cluj-Napoca, the biological sciences and AI research institutes, Transilvania IT, the Romanian SME council and the Romanian DIH association.","partner_canonical_org_id":"org-empanelled-ici-bucharest","partner_name_source_form":"Institutul Național de Cercetare-Dezvoltare în Informatică – ICI București","allocation_stage":"empanelled"},{"partner_name":"Galicia Supercomputing Center (CESGA) (1HealthAI, Spain — Round 3)","gpu_count":null,"gpu_model":null,"contract_award_url":"https://www.eurohpc-ju.europa.eu/eurohpc-ju-selects-six-additional-ai-factories-expand-europes-ai-capabilities-2025-10-10_en","authority_tier":1,"vintage":"2025-10-10","notes":"CESGA hosts 1HealthAI for human, animal and environmental health. CSIC co-leads the consortium, which includes the universities of A Coruña, Santiago de Compostela and Vigo, DATAlife and Gradiant.","partner_canonical_org_id":"org-cesga","partner_name_source_form":"Centro de Supercomputación de Galicia","allocation_stage":"empanelled"}],"data_quality_flags":["The €8.2 billion budget includes €4.1 billion from EU programmes and a similar contribution from participating countries. Private members are expected to contribute a further €900 million; these amounts cover different funding sources within the wider EuroHPC programme.","The September 2024 AI supercomputer call offered up to €800 million in EU funding, matched by participating countries.","LISA’s €50 million budget covers acquisition, installation, operation and support. Its relationship to the wider budget is not itemised in the inauguration announcement.","The GPU entries cover JUPITER and LISA. EuroHPC describes JUPITER’s accelerator count as approximately 24,000 GH200 superchips.","The 13 AI Factory Antennas selected in October 2025 had an EU funding contribution of around €55 million, matched by participating states.","The partner list includes selected AI Factory hosts and consortium members. Selection announcements do not specify a GPU allocation for every member."],"last_validated_at":"2026-09-29"}